Tsakos Energy Navigation (TEN) Construction in Progress: 2009-2024
Historic Construction in Progress for Tsakos Energy Navigation (TEN) over the last 16 years, with Dec 2024 value amounting to $246.4 billion.
- Tsakos Energy Navigation's Construction in Progress rose 44.39% to $355.8 million in Q3 2025 from the same period last year, while for Sep 2025 it was $355.8 million, marking a year-over-year increase of 44.39%. This contributed to the annual value of $246.4 billion for FY2024, which is 182963.42% up from last year.
- Tsakos Energy Navigation's Construction in Progress amounted to $246.4 billion in FY2024, which was up 182,963.42% from -$134.7 million recorded in FY2023.
- Tsakos Energy Navigation's 5-year Construction in Progress high stood at $246.4 billion for FY2024, and its period low was -$134.7 million during FY2023.
- In the last 3 years, Tsakos Energy Navigation's Construction in Progress had a median value of -$31.8 million in 2022 and averaged $82.1 billion.
- Per our database at Business Quant, Tsakos Energy Navigation's Construction in Progress plummeted by 323.59% in 2023 and then skyrocketed by 182,963.42% in 2024.
- Tsakos Energy Navigation's Construction in Progress (MRY) stood at -$39.7 million in 2020, then plummeted by 40.17% to -$55.6 million in 2021, then soared by 42.79% to -$31.8 million in 2022, then plummeted by 323.59% to -$134.7 million in 2023, then surged by 182,963.42% to $246.4 billion in 2024.
- Its Construction in Progress was $246.4 billion in FY2024, compared to -$134.7 million in FY2023 and -$31.8 million in FY2022.