Tsakos Energy Navigation (TEN) Construction in Progress (2016 - 2018)
Tsakos Energy Navigation has reported Construction in Progress over the past 9 years, most recently at $16.2 million for Q4 2018.
- Quarterly results put Construction in Progress at $16.2 million for Q4 2018, up 879.45% from a year ago — trailing twelve months through Dec 2018 was $16.2 million (up 879.45% YoY), and the annual figure for FY2018 was $16.2 million, up 879.45%.
- Construction in Progress for Q4 2018 was $16.2 million at Tsakos Energy Navigation, up from $1.6 million in the prior quarter.
- Over the last five years, Construction in Progress for TEN hit a ceiling of $371.2 million in Q4 2015 and a floor of $1.6 million in Q4 2017.
- Median Construction in Progress over the past 5 years was $189.0 million (2014), compared with a mean of $158.9 million.
- Biggest five-year swings in Construction in Progress: plummeted 99.24% in 2017 and later soared 879.45% in 2018.
- Tsakos Energy Navigation's Construction in Progress stood at $189.0 million in 2014, then soared by 96.47% to $371.2 million in 2015, then plummeted by 41.67% to $216.5 million in 2016, then plummeted by 99.24% to $1.6 million in 2017, then soared by 879.45% to $16.2 million in 2018.
- The last three reported values for Construction in Progress were $16.2 million (Q4 2018), $1.6 million (Q4 2017), and $216.5 million (Q4 2016) per Business Quant data.