Sterling Infrastructure (STRL) Construction in Progress: 2011-2013
Historic Construction in Progress for Sterling Infrastructure (STRL) over the last 3 years, with Dec 2013 value amounting to $101.0 million.
- Sterling Infrastructure's Construction in Progress fell 51.07% to $61.0 million in Q3 2014 from the same period last year, while for Sep 2014 it was $61.0 million, marking a year-over-year decrease of 51.07%. This contributed to the annual value of $101.0 million for FY2013, which is 52.78% down from last year.
- Per Sterling Infrastructure's latest filing, its Construction in Progress stood at $101.0 million for FY2013, which was down 52.78% from $213.9 million recorded in FY2012.
- Sterling Infrastructure's Construction in Progress' 5-year high stood at $539.8 million during FY2011, with a 5-year trough of $101.0 million in FY2013.
- For the 3-year period, Sterling Infrastructure's Construction in Progress averaged around $284.9 million, with its median value being $213.9 million (2012).
- Data for Sterling Infrastructure's Construction in Progress shows a maximum YoY plummeted of 60.37% (in 2012) over the last 5 years.
- Yearly analysis of 3 years shows Sterling Infrastructure's Construction in Progress stood at $539.8 million in 2011, then plummeted by 60.37% to $213.9 million in 2012, then slumped by 52.78% to $101.0 million in 2013.