Sterling Infrastructure (STRL) EPS (Basic) (2011 - 2026)
Sterling Infrastructure (STRL) posted EPS (Basic) of $5.5 for Q2 2026, up 62.33% on a QoQ basis from $3.39 in Q1 2026, and up 111.23% year-over-year from $2.6 in Q2 2025.
Analysis
Sterling Infrastructure (STRL) EPS (Basic) (2011 - 2026) Analysis & Trends
Sterling Infrastructure has reported EPS (Basic) for 16 years, with the latest figure at $5.5 in Q2 2026.
- On a quarterly basis, EPS (Basic) rose 111.23% year-over-year to $5.5 in Q2 2026; TTM through Jun 2026 was $15.0, a 49.93% increase from a year earlier, with the FY2025 full-year figure at $10.14, up 3468.61% from the prior year.
- EPS (Basic) was $5.5 for Q2 2026 at Sterling Infrastructure, up from $3.39 in the prior quarter.
- The five-year high for EPS (Basic) was $5.5 in Q2 2026, with the low at -$2.36 in Q4 2022.
- Average EPS (Basic) over 5 years is $1.59, with a median of $1.24 recorded in 2025.
- The sharpest annual moves came in 2022 and 2024: EPS (Basic) sank 718.01% in 2022, then surged 6683.78% in 2024.
- Over 5 years, EPS (Basic) stood at -$2.36 in 2022, then soared by 103.23% to $0.08 in 2023, then soared by 4896.02% to $3.8 in 2024, then decreased by 21.02% to $3.0 in 2025, then jumped by 83.04% to $5.5 in 2026.
- The last three EPS (Basic) figures came in at $5.5 (Q2 2026), $3.39 (Q1 2026), and $3.0 (Q4 2025), per Business Quant data.
Peer Set
Peer Comparison
| # | Company | Market Cap | Enterprise Value | Gross Profit (Qtr) | EPS (Basic) (Qtr) |
|---|---|---|---|---|---|
| 1 | Ferrovial | 40.46 Bn | 37.11 Bn | - | - |
| 2 | Emcor | 34.53 Bn | 33.61 Bn | 1.02 Bn | 9.09 |
| 3 | Jacobs Solutions | 16.62 Bn | 15.43 Bn | 810.70 Mn | 1.15 |
| 4 | Sterling Infrastructure | 15.68 Bn | 15.25 Bn | 289.96 Mn | 5.50 |
| 5 | Aecom | 8.18 Bn | 7.37 Bn | -34.04 Mn | -0.64 |
| 6 | Stantec | 7.95 Bn | 7.95 Bn | 1.36 Bn | 1.65 |
| 7 | Fluor | 7.35 Bn | 4.40 Bn | 179.00 Mn | 0.94 |
| 8 | Argan | 5.81 Bn | 5.26 Bn | 74.22 Mn | 3.80 |
| 9 | Installed Building Products | 5.43 Bn | 5.03 Bn | 258.90 Mn | 2.44 |
| 10 | Granite Construction | 5.20 Bn | 4.34 Bn | 238.77 Mn | -6.21 |
Historic Data
Download Data
Historic Data
| Date | Value |
|---|---|
| Jun 30, 2026 | 5.50 |
| Mar 31, 2026 | 3.39 |
| Dec 31, 2025 | 3.00 |
| Sep 30, 2025 | 3.16 |
| Jun 30, 2025 | 2.60 |
| Mar 31, 2025 | 1.39 |
| Dec 31, 2024 | 3.80 |
| Sep 30, 2024 | 2.13 |
| Jun 30, 2024 | 1.77 |
| Mar 31, 2024 | 1.09 |
| Dec 31, 2023 | 0.08 |
| Sep 30, 2023 | 0.03 |
| Jun 30, 2023 | 0.05 |
| Mar 31, 2023 | 0.64 |
| Dec 31, 2022 | -2.36 |
| Sep 30, 2022 | 0.98 |
| Jun 30, 2022 | 0.86 |
| Mar 31, 2022 | 0.59 |
| Dec 31, 2021 | 0.38 |
| Sep 30, 2021 | 0.74 |