Sterling Infrastructure (STRL) Construction in Progress: 2011-2014
Historic Construction in Progress for Sterling Infrastructure (STRL) over the last 2 years, with Sep 2014 value amounting to $61.0 million.
- Sterling Infrastructure's Construction in Progress fell 51.07% to $61.0 million in Q3 2014 from the same period last year, while for Sep 2014 it was $61.0 million, marking a year-over-year decrease of 51.07%. This contributed to the annual value of $101.0 million for FY2013, which is 52.78% down from last year.
- As of Q3 2014, Sterling Infrastructure's Construction in Progress stood at $61.0 million, which was down 11.20% from $68.7 million recorded in Q2 2014.
- Sterling Infrastructure's 5-year Construction in Progress high stood at $539.8 million for Q4 2011, and its period low was $61.0 million during Q3 2014.
- For the 3-year period, Sterling Infrastructure's Construction in Progress averaged around $146.9 million, with its median value being $124.7 million (2013).
- Data for Sterling Infrastructure's Construction in Progress shows a maximum YoY tumbled of 60.39% (in 2013) over the last 5 years.
- Quarterly analysis of 4 years shows Sterling Infrastructure's Construction in Progress stood at $539.8 million in 2011, then plummeted by 60.37% to $213.9 million in 2012, then plummeted by 52.78% to $101.0 million in 2013, then tumbled by 51.07% to $61.0 million in 2014.
- Its Construction in Progress stands at $61.0 million for Q3 2014, versus $68.7 million for Q2 2014 and $84.9 million for Q1 2014.