Sterling Infrastructure (STRL) Liabilities from Discontinued Operations (2021)
Sterling Infrastructure (STRL) posted Liabilities from Discontinued Operations of $51.9 million for Q4 2021.
Analysis
Sterling Infrastructure (STRL) Liabilities from Discontinued Operations (2021) Analysis & Trends
Sterling Infrastructure has reported Liabilities from Discontinued Operations for 1 years, with the latest figure at $51.9 million in Q4 2021.
- On a quarterly basis, Liabilities from Discontinued Operations changed N/A year-over-year to $51.9 million in Q4 2021; TTM through Dec 2021 was $51.9 million, a N/A change from a year earlier, with the FY2021 full-year figure at $51.9 million, changed N/A from the prior year.
- Liabilities from Discontinued Operations was $51.9 million for Q4 2021 at Sterling Infrastructure.
- The five-year high for Liabilities from Discontinued Operations was $51.9 million in Q4 2021, with the low at $51.9 million in Q4 2021.
Peer Set
Peer Comparison
| # | Company | Market Cap | Enterprise Value | Gross Profit (Qtr) |
|---|---|---|---|---|
| 1 | Ferrovial | 40.46 Bn | 37.11 Bn | - |
| 2 | Emcor | 34.53 Bn | 33.61 Bn | 1.02 Bn |
| 3 | Jacobs Solutions | 16.62 Bn | 15.43 Bn | 810.70 Mn |
| 4 | Sterling Infrastructure | 15.68 Bn | 15.25 Bn | 289.96 Mn |
| 5 | Aecom | 8.18 Bn | 7.37 Bn | -34.04 Mn |
| 6 | Stantec | 7.95 Bn | 7.95 Bn | 1.36 Bn |
| 7 | Fluor | 7.35 Bn | 4.40 Bn | 179.00 Mn |
| 8 | Argan | 5.81 Bn | 5.26 Bn | 74.22 Mn |
| 9 | Installed Building Products | 5.43 Bn | 5.03 Bn | 258.90 Mn |
| 10 | Granite Construction | 5.20 Bn | 4.34 Bn | 238.77 Mn |