KPIs & Operating Metrics(New)

First Bancorp (FBP) Construction in Progress: 2016-2021

Historic Construction in Progress for First Bancorp (FBP) over the last 6 years, with Dec 2021 value amounting to $8.1 million.

  • First Bancorp's Construction in Progress rose 5.71% to $8.1 million in Q4 2021 from the same period last year, while for Dec 2021 it was $8.1 million, marking a year-over-year increase of 5.71%. This contributed to the annual value of $8.1 million for FY2021, which is 5.71% up from last year.
  • As of FY2021, First Bancorp's Construction in Progress stood at $8.1 million, which was up 5.71% from $7.7 million recorded in FY2020.
  • Over the past 5 years, First Bancorp's Construction in Progress peaked at $17.5 million during FY2018, and registered a low of $7.7 million during FY2020.
  • Its 3-year average for Construction in Progress is $11.0 million, with a median of $8.1 million in 2021.
  • Its Construction in Progress has fluctuated over the past 5 years, first surged by 69.56% in 2018, then crashed by 55.34% in 2020.
  • First Bancorp's Construction in Progress (Yearly) stood at $10.3 million in 2017, then spiked by 69.56% to $17.5 million in 2018, then declined by 1.94% to $17.1 million in 2019, then slumped by 55.34% to $7.7 million in 2020, then rose by 5.71% to $8.1 million in 2021.