Growth Metrics

Ellomay Capital (ELLO) Construction in Progress (2017 - 2025)

Ellomay Capital filings provide 9 years of Construction in Progress readings, the most recent being -$4.8 million for Q4 2025.

  • On a quarterly basis, Construction in Progress fell 10.47% to -$4.8 million in Q4 2025 year-over-year; TTM through Dec 2025 was -$4.8 million, a 10.47% decrease, with the full-year FY2025 number at -$4883.0, down 14.38% from a year prior.
  • Construction in Progress hit -$4.8 million in Q4 2025 for Ellomay Capital, down from -$3969.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $1530.0 in Q1 2024 to a low of -$4.8 million in Q4 2025.
  • Median Construction in Progress over the past 5 years was -$1.3 million (2022), compared with a mean of -$1.7 million.
  • Biggest five-year swings in Construction in Progress: skyrocketed 100.09% in 2024 and later tumbled 137907.38% in 2025.
  • Ellomay Capital's Construction in Progress stood at -$2.9 million in 2021, then plummeted by 34.56% to -$3.9 million in 2022, then decreased by 24.44% to -$4.8 million in 2023, then increased by 8.78% to -$4.4 million in 2024, then dropped by 10.47% to -$4.8 million in 2025.
  • The last three reported values for Construction in Progress were -$4.8 million (Q4 2025), -$3969.0 (Q3 2025), and -$3.4 million (Q2 2025) per Business Quant data.