Growth Metrics

Clearway Energy (CWEN) Construction in Progress (2016 - 2017)

Clearway Energy's Construction in Progress history spans 5 years, with the latest figure at $34.0 million for Q4 2017.

  • For Q4 2017, Construction in Progress rose 41.67% year-over-year to $34.0 million; the TTM value through Dec 2017 reached $34.0 million, up 41.67%, while the annual FY2017 figure was $34.0 million, 41.67% up from the prior year.
  • Construction in Progress reached $34.0 million in Q4 2017 per CWEN's latest filing, up from $24.0 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $34.0 million in Q4 2017 to a low of $4.0 million in Q3 2015.
  • Average Construction in Progress over 5 years is $13.6 million, with a median of $9.0 million recorded in 2014.
  • Peak YoY movement for Construction in Progress: tumbled 42.86% in 2015, then soared 166.67% in 2016.
  • A 5-year view of Construction in Progress shows it stood at $6.0 million in 2013, then soared by 50.0% to $9.0 million in 2014, then changed by 0.0% to $9.0 million in 2015, then skyrocketed by 166.67% to $24.0 million in 2016, then skyrocketed by 41.67% to $34.0 million in 2017.
  • Per Business Quant, the three most recent readings for CWEN's Construction in Progress are $34.0 million (Q4 2017), $24.0 million (Q4 2016), and $26.0 million (Q1 2016).