Clearway Energy (CWEN) Construction in Progress (2016 - 2017)
Historic Construction in Progress for Clearway Energy (CWEN) over the last 6 years, with Q4 2017 value amounting to $34.0 million.
- Clearway Energy's Construction in Progress rose 4166.67% to $34.0 million in Q4 2017 from the same period last year, while for Dec 2017 it was $34.0 million, marking a year-over-year increase of 4166.67%. This contributed to the annual value of $34.0 million for FY2017, which is 4166.67% up from last year.
- As of Q4 2017, Clearway Energy's Construction in Progress stood at $34.0 million, which was up 4166.67% from $24.0 million recorded in Q4 2016.
- Over the past 5 years, Clearway Energy's Construction in Progress peaked at $34.0 million during Q4 2017, and registered a low of $4.0 million during Q3 2015.
- Its 5-year average for Construction in Progress is $13.6 million, with a median of $9.0 million in 2014.
- As far as peak fluctuations go, Clearway Energy's Construction in Progress crashed by 9940.18% in 2013, and later surged by 16666.67% in 2016.
- Quarter analysis of 5 years shows Clearway Energy's Construction in Progress stood at $6.0 million in 2013, then skyrocketed by 50.0% to $9.0 million in 2014, then changed by 0.0% to $9.0 million in 2015, then skyrocketed by 166.67% to $24.0 million in 2016, then skyrocketed by 41.67% to $34.0 million in 2017.
- Its Construction in Progress stands at $34.0 million for Q4 2017, versus $24.0 million for Q4 2016 and $26.0 million for Q1 2016.