Cpi Aerostructures (CVU) Share-based Compensation (2010 - 2026)
Cpi Aerostructures (CVU) reported Share-based Compensation of $516599.0 for Q1 2026, up 61.32% on a YoY basis from $320229.0 in Q1 2025, and up 202.89% sequentially from -$502101.0 in Q4 2025.
Cpi Aerostructures (CVU) Share-based Compensation (2010 - 2026) Analysis & Trends
Cpi Aerostructures (CVU) has 17 years of Share-based Compensation data on file, last reported at $516599.0 in Q1 2026.
- For the quarter ending Q1 2026, Share-based Compensation rose 61.32% year-over-year to $516599.0; the trailing twelve-month figure through Mar 2026 stood at $516599.0 (down 19.71% YoY), and the FY2025 full-year result was $184689.0, down 69.46% from the prior year.
- Share-based Compensation grew to $516599.0 in Q1 2026, from -$502101.0 in the prior quarter.
- In the past five years, Share-based Compensation ranged from a high of $516599.0 in Q1 2026 to a low of -$502101.0 in Q4 2025.
- A 5-year average of $137453.0 and a median of $137498.0 in 2022 frame the typical range for Share-based Compensation.
- Across the five-year window, Share-based Compensation soared 1209.49% in 2023 and slumped 770.26% in 2025, its largest moves.
- Tracing CVU's Share-based Compensation over 5 years: stood at $107519.0 in 2022, then grew by 3.02% to $110771.0 in 2023, then slumped by 32.37% to $74911.0 in 2024, then plunged by 770.26% to -$502101.0 in 2025, then jumped by 202.89% to $516599.0 in 2026.
- Business Quant data shows CVU's Share-based Compensation at $516599.0 in Q1 2026, -$502101.0 in Q4 2025, and $102206.0 in Q3 2025.
Peer Comparison
| # | Company | Market Cap | Enterprise Value | Gross Profit (Qtr) | Share-based Compensation (Qtr) |
|---|---|---|---|---|---|
| 1 | General Electric | 375.88 Bn | 366.54 Bn | -3.10 Bn | - |
| 2 | Rtx | 290.44 Bn | 282.14 Bn | 9.91 Bn | 164.00 Mn |
| 3 | Boeing | 170.34 Bn | 150.32 Bn | 2.41 Bn | -3.00 Mn |
| 4 | Lockheed Martin | 133.47 Bn | 129.67 Bn | 2.45 Bn | 97.00 Mn |
| 5 | Howmet Aerospace | 113.92 Bn | 111.48 Bn | 854.00 Mn | 21.00 Mn |
| 6 | General Dynamics | 103.44 Bn | 99.11 Bn | 6.76 Bn | 67.00 Mn |
| 7 | Northrop Grumman | 77.10 Bn | 74.80 Bn | 3.72 Bn | 38.00 Mn |
| 8 | TransDigm | 73.27 Bn | 69.39 Bn | 1.51 Bn | 26.00 Mn |
| 9 | L3Harris Technologies | 51.92 Bn | 51.33 Bn | 1.40 Bn | 21.00 Mn |
| 10 | Cpi Aerostructures | 63.54 Mn | 62.54 Mn | 4.48 Mn | 516,599.00 |
Historic Data
Download Data| Date | Value |
|---|---|
| Mar 31, 2026 | 516,599.00 |
| Mar 31, 2026 | 516,599.00 |
| Dec 31, 2025 | -502,101.00 |
| Dec 31, 2025 | -502,101.00 |
| Sep 30, 2025 | 102,206.00 |
| Sep 30, 2025 | 102,206.00 |
| Jun 30, 2025 | 168,583.00 |
| Jun 30, 2025 | 168,583.00 |
| Mar 31, 2025 | 320,229.00 |
| Mar 31, 2025 | 320,229.00 |
| Dec 31, 2024 | 74,911.00 |
| Dec 31, 2024 | 74,911.00 |
| Sep 30, 2024 | 72,713.00 |
| Sep 30, 2024 | 72,713.00 |
| Jun 30, 2024 | 175,536.00 |
| Jun 30, 2024 | 175,536.00 |
| Mar 31, 2024 | 281,522.00 |
| Mar 31, 2024 | 281,522.00 |
| Dec 31, 2023 | 110,771.00 |
| Dec 31, 2023 | 110,771.00 |