Southeast Airport (ASR) Non-Current Debt (2016 - 2025)
Southeast Airport has reported Non-Current Debt over the past 10 years, most recently at $1.0 billion for Q4 2025.
- Quarterly Non-Current Debt rose 831.34% to $1.0 billion in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $1.0 billion through Dec 2025, up 831.34% year-over-year, with the annual reading at $1.0 billion for FY2025, 831.34% up from the prior year.
- Non-Current Debt was $1.0 billion for Q4 2025 at Southeast Airport, up from $462.7 million in the prior quarter.
- Over five years, Non-Current Debt peaked at $660.9 billion in Q3 2023 and troughed at -$298.9 billion in Q1 2024.
- The 5-year median for Non-Current Debt is $462.7 million (2025), against an average of $11.9 billion.
- Year-over-year, Non-Current Debt soared 130906.34% in 2023 and then plummeted 61622.26% in 2024.
- A 5-year view of Non-Current Debt shows it stood at $318.2 million in 2021, then skyrocketed by 58.02% to $502.8 million in 2022, then fell by 4.73% to $479.0 million in 2023, then tumbled by 77.47% to $107.9 million in 2024, then soared by 831.34% to $1.0 billion in 2025.
- Per Business Quant, the three most recent readings for ASR's Non-Current Debt are $1.0 billion (Q4 2025), $462.7 million (Q3 2025), and $107.9 million (Q4 2024).