V2X (VVX) Share-based Compensation (2014 - 2026)
V2X's (VVX) quarterly Share-based Compensation came in at $3.6 million in Q2 2026, up 47.19% YoY from $2.5 million in Q2 2025, and down 59.64% on a QoQ basis from $8.9 million in Q4 2025.
V2X (VVX) Share-based Compensation (2014 - 2026) Analysis & Trends
V2X (VVX) has 13 years of Share-based Compensation data on file, last reported at $3.6 million in Q2 2026.
- Quarterly Share-based Compensation rose 47.19% year-over-year to $3.6 million in Q2 2026, while the trailing twelve-month figure through Apr 2026 was $13.1 million (up 140.42% YoY) and the FY2025 annual result came in at $11.9 million, up 46.52% from the prior year.
- Share-based Compensation declined to $3.6 million in Q2 2026, from $8.9 million in the prior quarter.
- In the past five years, Share-based Compensation ranged from a high of $611.8 million in Q4 2022 to a low of -$4.7 million in Q4 2024.
- A 5-year average of $40.4 million and a median of $3.6 million in 2026 frame the typical range for Share-based Compensation.
- The widest YoY moves for Share-based Compensation: up 43478.06% in 2022, down 1079.55% in 2022.
- Tracing VVX's Share-based Compensation over 5 years: stood at $611.8 million in 2022, then tumbled by 97.55% to $15.0 million in 2023, then tumbled by 131.63% to -$4.7 million in 2024, then surged by 288.81% to $8.9 million in 2025, then plunged by 59.64% to $3.6 million in 2026.
- The last three Share-based Compensation figures came in at $3.6 million (Q2 2026), $8.9 million (Q4 2025), and -$3.2 million (Q3 2025), per Business Quant data.
Peer Comparison
| # | Company | Market Cap | Enterprise Value | Gross Profit (Qtr) | Stock Comp. (Qtr) |
|---|---|---|---|---|---|
| 1 | General Electric | 364.05 Bn | 354.71 Bn | 6.95 Bn | - |
| 2 | Rtx | 284.73 Bn | 276.43 Bn | 9.91 Bn | 164.00 Mn |
| 3 | Boeing | 168.54 Bn | 148.52 Bn | 2.41 Bn | -3.00 Mn |
| 4 | Lockheed Martin | 130.43 Bn | 126.64 Bn | 2.45 Bn | 97.00 Mn |
| 5 | Howmet Aerospace | 109.21 Bn | 108.65 Bn | 951.00 Mn | 1.00 Mn |
| 6 | General Dynamics | 103.34 Bn | 99.01 Bn | 6.76 Bn | 67.00 Mn |
| 7 | Northrop Grumman | 78.39 Bn | 76.09 Bn | 3.72 Bn | 1.00 Mn |
| 8 | TransDigm | 68.58 Bn | 65.81 Bn | 1.63 Bn | 65.00 Mn |
| 9 | Axon Enterprise | 51.14 Bn | 50.47 Bn | 546.45 Mn | 144.00 Mn |
| 10 | V2X | 2.48 Bn | 2.27 Bn | 109.50 Mn | 3.66 Mn |
Historic Data
Download Data| Date | Value |
|---|---|
| Jul 3, 2026 | 3.66 Mn |
| Jul 3, 2026 | 3.66 Mn |
| Apr 3, 2026 | 3.61 Mn |
| Apr 3, 2026 | 3.61 Mn |
| Dec 31, 2025 | 8.94 Mn |
| Dec 31, 2025 | 8.94 Mn |
| Sep 26, 2025 | -3.20 Mn |
| Sep 26, 2025 | -3.20 Mn |
| Jun 27, 2025 | 3.73 Mn |
| Jun 27, 2025 | 3.73 Mn |
| Mar 28, 2025 | 2.45 Mn |
| Mar 28, 2025 | 2.45 Mn |
| Dec 31, 2024 | -4.74 Mn |
| Dec 31, 2024 | -4.74 Mn |
| Sep 27, 2024 | 7.11 Mn |
| Sep 27, 2024 | 7.11 Mn |
| Jun 28, 2024 | 618,000.00 |
| Jun 28, 2024 | 618,000.00 |
| Mar 29, 2024 | 5.15 Mn |
| Mar 29, 2024 | 5.15 Mn |