V2X (VVX) Share-based Compensation (2014 - 2026)
V2X (VVX) posted Share-based Compensation of $3.6 million for Q2 2026, up 28.75% quarter-over-quarter from $2.8 million in Q4 2025, and up 47.19% year-on-year from $2.5 million in Q2 2025.
V2X (VVX) Share-based Compensation (2014 - 2026) Analysis & Trends
V2X (VVX) has reported Share-based Compensation for 13 consecutive years, with $3.6 million the latest figure, recorded in Q2 2026.
- Share-based Compensation for Q2 2026 came in at $3.6 million, up 47.19% year-over-year; the trailing twelve-month figure through Apr 2026 was $13.1 million (down 1.44% YoY), and the FY2025 annual result was $11.9 million, down 25.33% from the prior year.
- Share-based Compensation was $3.6 million for Q2 2026 at V2X, up from $2.8 million in the prior quarter.
- Over five years, Share-based Compensation peaked at $14.1 million in Q3 2022 and troughed at $1.1 million in Q3 2024.
- Average Share-based Compensation over 5 years is $5.7 million, with a median of $3.7 million recorded in 2025.
- Year-over-year, Share-based Compensation jumped 892.59% in 2022 and plunged 83.03% in 2024.
- Over 5 years, Share-based Compensation stood at $13.9 million in 2022, then slumped by 56.7% to $6.0 million in 2023, then plunged by 48.71% to $3.1 million in 2024, then decreased by 9.43% to $2.8 million in 2025, then climbed by 28.75% to $3.6 million in 2026.
- Per Business Quant data, the three most recent Share-based Compensation figures were $3.6 million in Q2 2026, $2.8 million in Q4 2025, and $2.9 million in Q3 2025.
Peer Comparison
| # | Company | Market Cap | Enterprise Value | Gross Profit (Qtr) | Stock Comp. (Qtr) |
|---|---|---|---|---|---|
| 1 | Boeing | 1,106.33 Bn | 1,085.43 Bn | 2.55 Bn | 161.00 Mn |
| 2 | Rtx | 258.51 Bn | 253.40 Bn | 9.08 Bn | 132.00 Mn |
| 3 | General Dynamics | 174.86 Bn | 171.21 Bn | 9.09 Bn | 40.00 Mn |
| 4 | Lockheed Martin | 119.99 Bn | 118.10 Bn | 2.08 Bn | 83.00 Mn |
| 5 | Howmet Aerospace | 107.26 Bn | 104.82 Bn | 854.00 Mn | 21.00 Mn |
| 6 | TransDigm | 76.18 Bn | 72.30 Bn | 1.51 Bn | 26.00 Mn |
| 7 | Northrop Grumman | 73.88 Bn | 71.79 Bn | 3.45 Bn | 20.00 Mn |
| 8 | Rocket Lab | 60.59 Bn | 59.31 Bn | 76.49 Mn | 28.12 Mn |
| 9 | L3Harris Technologies | 54.60 Bn | 54.60 Bn | 1.40 Bn | 21.00 Mn |
| 10 | V2X | 2.24 Bn | 2.04 Bn | 105.82 Mn | 3.61 Mn |
Historic Data
Download Data| Date | Value |
|---|---|
| Apr 3, 2026 | 3.61 Mn |
| Apr 3, 2026 | 3.61 Mn |
| Dec 31, 2025 | 2.80 Mn |
| Dec 31, 2025 | 2.80 Mn |
| Sep 26, 2025 | 2.94 Mn |
| Sep 26, 2025 | 2.94 Mn |
| Jun 27, 2025 | 3.73 Mn |
| Jun 27, 2025 | 3.73 Mn |
| Mar 28, 2025 | 2.45 Mn |
| Mar 28, 2025 | 2.45 Mn |
| Dec 31, 2024 | 3.10 Mn |
| Dec 31, 2024 | 3.10 Mn |
| Sep 27, 2024 | 1.08 Mn |
| Sep 27, 2024 | 1.08 Mn |
| Jun 28, 2024 | 6.65 Mn |
| Jun 28, 2024 | 6.65 Mn |
| Mar 29, 2024 | 5.15 Mn |
| Mar 29, 2024 | 5.15 Mn |
| Dec 31, 2023 | 6.03 Mn |
| Dec 31, 2023 | 6.03 Mn |