Simpson Manufacturing (SSD) Share-based Compensation (2009 - 2026)
Simpson Manufacturing's (SSD) quarterly Share-based Compensation came in at $5.1 million in Q1 2026, down 23.26% year-on-year from $6.6 million in Q1 2025, and up 55.35% quarter-over-quarter from $3.3 million in Q4 2025.
Simpson Manufacturing (SSD) Share-based Compensation (2009 - 2026) Analysis & Trends
Simpson Manufacturing has disclosed Share-based Compensation across 18 years of filings, most recently posting $5.1 million for Q1 2026.
- Share-based Compensation for Q1 2026 came in at $5.1 million, down 23.26% year-over-year; the trailing twelve-month figure through Mar 2026 was $21.4 million (up 5.75% YoY), and the FY2025 annual result was $23.0 million, up 20.78% from the prior year.
- Share-based Compensation came in at $5.1 million for Q1 2026 at Simpson Manufacturing, up from $3.3 million in the prior quarter.
- In the past five years, Share-based Compensation ranged from a high of $6.6 million in Q3 2025 to a low of $2.0 million in Q4 2022.
- The 5-year median for Share-based Compensation is $5.1 million (2024), against an average of $5.1 million.
- Across the five-year window, Share-based Compensation slumped 53.89% in 2022 and jumped 204.41% in 2023, its largest moves.
- Simpson Manufacturing's Share-based Compensation stood at $2.0 million in 2022, then surged by 204.41% to $6.1 million in 2023, then sank by 50.49% to $3.0 million in 2024, then increased by 8.45% to $3.3 million in 2025, then jumped by 55.35% to $5.1 million in 2026.
- The last three Share-based Compensation figures came in at $5.1 million (Q1 2026), $3.3 million (Q4 2025), and $6.6 million (Q3 2025), per Business Quant data.
Peer Comparison
| # | Company | Market Cap | Enterprise Value | Gross Profit (Qtr) | Share-based Compensation (Qtr) |
|---|---|---|---|---|---|
| 1 | West Fraser Timber | 175.09 Bn | 174.89 Bn | 345.00 Mn | - |
| 2 | Simpson Manufacturing | 8.25 Bn | 7.91 Bn | 265.89 Mn | 5.06 Mn |
| 3 | Ufp Industries | 4.93 Bn | 4.17 Bn | 235.89 Mn | - |
| 4 | Boise Cascade | 2.68 Bn | 2.34 Bn | 1.35 Bn | 3.46 Mn |
| 5 | Jewett Cameron Trading | 7.88 Mn | 7.34 Mn | 1.65 Mn | - |
| 6 | CL Workshop | 30,815.30 | 30,815.30 | - | - |
Historic Data
Download Data| Date | Value |
|---|---|
| Mar 31, 2026 | 5.06 Mn |
| Mar 31, 2026 | 5.06 Mn |
| Dec 31, 2025 | 3.26 Mn |
| Dec 31, 2025 | 3.26 Mn |
| Sep 30, 2025 | 6.65 Mn |
| Sep 30, 2025 | 6.65 Mn |
| Jun 30, 2025 | 6.47 Mn |
| Jun 30, 2025 | 6.47 Mn |
| Mar 31, 2025 | 6.60 Mn |
| Mar 31, 2025 | 6.60 Mn |
| Dec 31, 2024 | 3.01 Mn |
| Dec 31, 2024 | 3.01 Mn |
| Sep 30, 2024 | 5.59 Mn |
| Sep 30, 2024 | 5.59 Mn |
| Jun 30, 2024 | 5.08 Mn |
| Jun 30, 2024 | 5.08 Mn |
| Mar 31, 2024 | 5.35 Mn |
| Mar 31, 2024 | 5.35 Mn |
| Dec 31, 2023 | 6.07 Mn |
| Dec 31, 2023 | 6.07 Mn |