Firefly Aerospace (FLY) Share-based Compensation (2024 - 2026)
Firefly Aerospace's (FLY) quarterly Share-based Compensation came in at $136.4 million in Q1 2026, up 31547.33% YoY from N/an in Q1 2025, and up 5816.68% on a QoQ basis from -$2.4 million in Q4 2025.
Firefly Aerospace (FLY) Share-based Compensation (2024 - 2026) Analysis & Trends
Firefly Aerospace (FLY) has 3 years of Share-based Compensation data on file, last reported at $136.4 million in Q1 2026.
- Quarterly Share-based Compensation rose 31547.33% year-over-year to $136.4 million in Q1 2026, while the trailing twelve-month figure through Mar 2026 was $136.4 million (up 8554.82% YoY) and the FY2025 annual result came in at $140.9 million, up 7549.29% from the prior year.
- Share-based Compensation improved to $136.4 million in Q1 2026, from -$2.4 million in the prior quarter.
- In the past five years, Share-based Compensation ranged from a high of $136.4 million in Q1 2026 to a low of -$2.4 million in Q4 2025.
- A 3-year average of $17.5 million and a median of $488500.0 in 2024 frame the typical range for Share-based Compensation.
- Annual changes were most pronounced in 2025 — Share-based Compensation sank 537.0% — and 2026, when it soared 31547.33%.
- Tracing FLY's Share-based Compensation over 3 years: stood at $546000.0 in 2024, then slumped by 537.0% to -$2.4 million in 2025, then surged by 5816.68% to $136.4 million in 2026.
- The last three Share-based Compensation figures came in at $136.4 million (Q1 2026), -$2.4 million (Q4 2025), and $4.0 million (Q3 2025), per Business Quant data.
Peer Comparison
| # | Company | Market Cap | Enterprise Value | Gross Profit (Qtr) | Stock Comp. (Qtr) |
|---|---|---|---|---|---|
| 1 | General Electric | 363.76 Bn | 354.41 Bn | 6.95 Bn | - |
| 2 | Rtx | 284.96 Bn | 276.65 Bn | 9.91 Bn | 164.00 Mn |
| 3 | Boeing | 168.40 Bn | 148.38 Bn | 2.41 Bn | -3.00 Mn |
| 4 | Lockheed Martin | 130.45 Bn | 126.66 Bn | 2.45 Bn | 97.00 Mn |
| 5 | Howmet Aerospace | 109.12 Bn | 108.55 Bn | 951.00 Mn | 1.00 Mn |
| 6 | General Dynamics | 103.50 Bn | 99.17 Bn | 6.76 Bn | 67.00 Mn |
| 7 | Northrop Grumman | 78.56 Bn | 76.25 Bn | 3.72 Bn | 1.00 Mn |
| 8 | TransDigm | 68.57 Bn | 65.80 Bn | 1.63 Bn | 65.00 Mn |
| 9 | Axon Enterprise | 51.14 Bn | 50.47 Bn | 546.45 Mn | 144.00 Mn |
| 10 | Firefly Aerospace | 4.03 Bn | 3.22 Bn | 23.88 Mn | 17.03 Mn |
Historic Data
Download Data| Date | Value |
|---|---|
| Jun 30, 2026 | 17.03 Mn |
| Jun 30, 2026 | 17.03 Mn |
| Mar 31, 2026 | 136.40 Mn |
| Mar 31, 2026 | 136.40 Mn |
| Dec 31, 2025 | -2.39 Mn |
| Dec 31, 2025 | -2.39 Mn |
| Sep 30, 2025 | 4.00 Mn |
| Sep 30, 2025 | 4.00 Mn |
| Jun 30, 2025 | 760,000.00 |
| Jun 30, 2025 | 760,000.00 |
| Mar 31, 2025 | 431,000.00 |
| Mar 31, 2025 | 431,000.00 |
| Dec 31, 2024 | 546,000.00 |
| Dec 31, 2024 | 546,000.00 |
| Sep 30, 2024 | 174,000.00 |
| Sep 30, 2024 | 174,000.00 |
| Jun 30, 2024 | 425,000.00 |
| Jun 30, 2024 | 425,000.00 |