WaterBridge Infrastructure (WBI) Share-based Compensation (2024 - 2026)
WaterBridge Infrastructure (WBI) posted Share-based Compensation of $2.6 million for Q1 2026, down 87.53% sequentially from $20.7 million in Q4 2025, and up 697.53% YoY from $324000.0 in Q1 2025.
WaterBridge Infrastructure (WBI) Share-based Compensation (2024 - 2026) Analysis & Trends
WaterBridge Infrastructure has reported Share-based Compensation for 3 years, with the latest figure at $2.6 million in Q1 2026.
- Quarterly Share-based Compensation rose 697.53% year-over-year to $2.6 million in Q1 2026, while the trailing twelve-month figure through Mar 2026 was $24.5 million (changed N/A YoY) and the FY2025 annual result came in at $5.3 million, down 43.98% from the prior year.
- Share-based Compensation slipped to $2.6 million in Q1 2026 per WBI's latest filing, from $20.7 million in the prior quarter.
- Over five years, Share-based Compensation peaked at $20.7 million in Q4 2025 and troughed at $121000.0 in Q4 2024.
- A 3-year average of $4.2 million and a median of $771000.0 in 2024 frame the typical range for Share-based Compensation.
- The widest YoY moves for Share-based Compensation: up 17023.14% in 2025, down 21.23% in 2025.
- Over 3 years, Share-based Compensation stood at $121000.0 in 2024, then jumped by 17023.14% to $20.7 million in 2025, then plunged by 87.53% to $2.6 million in 2026.
- According to Business Quant data, Share-based Compensation over the past three periods registered $2.6 million, $20.7 million, and $845000.0 for Q1 2026, Q4 2025, and Q3 2025 respectively.
Peer Comparison
| # | Company | Market Cap | Enterprise Value | Gross Profit (Qtr) | Stock Comp. (Qtr) |
|---|---|---|---|---|---|
| 1 | Slb | 79.92 Bn | 75.85 Bn | 4.63 Bn | 78.00 Mn |
| 2 | Baker Hughes | 62.15 Bn | 46.42 Bn | 1.58 Bn | 57.00 Mn |
| 3 | Tenaris | 52.90 Bn | 43.87 Bn | 984.66 | - |
| 4 | TechnipFMC | 31.00 Bn | 29.76 Bn | 1.40 Bn | 1.30 Mn |
| 5 | Halliburton | 29.57 Bn | 27.53 Bn | 2.10 Bn | - |
| 6 | Nov | 7.27 Bn | 6.10 Bn | 521.00 Mn | 15.00 Mn |
| 7 | Weatherford International | 6.57 Bn | 5.44 Bn | 662.00 Mn | 6.00 Mn |
| 8 | Kodiak Gas Services | 5.66 Bn | 5.52 Bn | 246.76 Mn | 124.06 Mn |
| 9 | Archrock | 5.54 Bn | 5.53 Bn | 244.51 Mn | 5.51 Mn |
| 10 | WaterBridge Infrastructure | 1.56 Bn | 1.51 Bn | 58.12 Mn | 2.58 Mn |
Historic Data
Download Data| Date | Value |
|---|---|
| Jun 30, 2026 | 2.58 Mn |
| Jun 30, 2026 | 2.58 Mn |
| Mar 31, 2026 | 2.58 Mn |
| Mar 31, 2026 | 2.58 Mn |
| Dec 31, 2025 | 20.72 Mn |
| Dec 31, 2025 | 20.72 Mn |
| Sep 16, 2025 | 845,000.00 |
| Sep 16, 2025 | 845,000.00 |
| Mar 31, 2025 | 324,000.00 |
| Mar 31, 2025 | 324,000.00 |
| Dec 31, 2024 | 121,000.00 |
| Dec 31, 2024 | 121,000.00 |
| Sep 30, 2024 | 697,000.00 |
| Sep 30, 2024 | 697,000.00 |