Companhia De Saneamento Basico Do Estado De Sao Paulo-Sabesp (SBS) Construction in Progress (2019 - 2022)

Companhia De Saneamento Basico Do Estado De Sao Paulo-Sabesp has reported Construction in Progress over the past 4 years, most recently at $20.8 million for Q4 2022.

  • Quarterly results put Construction in Progress at $20.8 million for Q4 2022, up 17.84% from a year ago — trailing twelve months through Dec 2022 was $20.8 million (up 17.84% YoY), and the annual figure for FY2022 was $20.8 million, up 17.84%.
  • Construction in Progress for Q4 2022 was $20.8 million at Companhia De Saneamento Basico Do Estado De Sao Paulo-Sabesp, up from $17.6 million in the prior quarter.
  • Over the last five years, Construction in Progress for SBS hit a ceiling of $20.8 million in Q4 2022 and a floor of $15839.5 in Q4 2019.
  • Median Construction in Progress over the past 4 years was $16.8 million (2020), compared with a mean of $13.6 million.
  • Biggest five-year swings in Construction in Progress: skyrocketed 101025.27% in 2020 and later rose 10.14% in 2021.
  • Companhia De Saneamento Basico Do Estado De Sao Paulo-Sabesp's Construction in Progress stood at $15839.5 in 2019, then skyrocketed by 101025.27% to $16.0 million in 2020, then rose by 10.14% to $17.6 million in 2021, then rose by 17.84% to $20.8 million in 2022.
  • The last three reported values for Construction in Progress were $20.8 million (Q4 2022), $17.6 million (Q4 2021), and $16.0 million (Q4 2020) per Business Quant data.