Companhia De Saneamento Basico Do Estado De Sao Paulo-Sabesp (SBS) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Companhia De Saneamento Basico Do Estado De Sao Paulo-Sabesp (SBS) over the last 16 years, with Q4 2024 value amounting to -$24085.9.
- Companhia De Saneamento Basico Do Estado De Sao Paulo-Sabesp's Construction in Progress rose 506.69% to -$24085.9 in Q4 2024 from the same period last year, while for Dec 2024 it was -$24085.9, marking a year-over-year increase of 506.69%. This contributed to the annual value of -$24085.9 for FY2024, which is 506.69% up from last year.
- According to the latest figures from Q4 2024, Companhia De Saneamento Basico Do Estado De Sao Paulo-Sabesp's Construction in Progress is -$24085.9, which was up 506.69% from -$239.5 million recorded in Q2 2024.
- In the past 5 years, Companhia De Saneamento Basico Do Estado De Sao Paulo-Sabesp's Construction in Progress ranged from a high of $20.8 million in Q4 2022 and a low of -$281.5 million during Q2 2020
- Over the past 5 years, Companhia De Saneamento Basico Do Estado De Sao Paulo-Sabesp's median Construction in Progress value was -$25371.4 (recorded in 2023), while the average stood at -$92.4 million.
- Per our database at Business Quant, Companhia De Saneamento Basico Do Estado De Sao Paulo-Sabesp's Construction in Progress skyrocketed by 10102528.01% in 2020 and then crashed by 10012.2% in 2023.
- Companhia De Saneamento Basico Do Estado De Sao Paulo-Sabesp's Construction in Progress (Quarter) stood at $16.0 million in 2020, then increased by 10.14% to $17.6 million in 2021, then increased by 17.84% to $20.8 million in 2022, then plummeted by 100.12% to -$25371.4 in 2023, then rose by 5.07% to -$24085.9 in 2024.
- Its Construction in Progress stands at -$24085.9 for Q4 2024, versus -$239.5 million for Q2 2024 and -$25371.4 for Q4 2023.