Growth Metrics

American Water Works Company (AWK) Construction in Progress (2016 - 2024)

Historic Construction in Progress for American Water Works Company (AWK) over the last 11 years, with Q4 2024 value amounting to $1.4 billion.

  • American Water Works Company's Construction in Progress rose 3067.31% to $1.4 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $1.4 billion, marking a year-over-year increase of 3067.31%. This contributed to the annual value of $1.4 billion for FY2024, which is 3067.31% up from last year.
  • Per American Water Works Company's latest filing, its Construction in Progress stood at $1.4 billion for Q4 2024, which was up 3067.31% from $1.0 billion recorded in Q4 2023.
  • In the past 5 years, American Water Works Company's Construction in Progress registered a high of $1.4 billion during Q4 2024, and its lowest value of $837.0 million during Q4 2020.
  • For the 5-year period, American Water Works Company's Construction in Progress averaged around $1.0 billion, with its median value being $974.0 million (2022).
  • In the last 5 years, American Water Works Company's Construction in Progress surged by 428.27% in 2022 and then soared by 3067.31% in 2024.
  • American Water Works Company's Construction in Progress (Quarter) stood at $837.0 million in 2020, then increased by 11.59% to $934.0 million in 2021, then increased by 4.28% to $974.0 million in 2022, then rose by 6.78% to $1.0 billion in 2023, then surged by 30.67% to $1.4 billion in 2024.
  • Its Construction in Progress stands at $1.4 billion for Q4 2024, versus $1.0 billion for Q4 2023 and $974.0 million for Q4 2022.