H2O America (HTO) Construction in Progress (2016 - 2025)
H2O America (HTO) has disclosed Construction in Progress for 16 consecutive years, with $269.3 million as the latest value for Q4 2025.
- On a quarterly basis, Construction in Progress rose 50.02% to $269.3 million in Q4 2025 year-over-year; TTM through Dec 2025 was $269.3 million, a 50.02% increase, with the full-year FY2025 number at $269.3 million, up 50.02% from a year prior.
- Construction in Progress was $269.3 million for Q4 2025 at H2O America, down from $277.9 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $277.9 million in Q3 2025 to a low of $107.0 million in Q4 2023.
- A 5-year average of $168.8 million and a median of $161.2 million in 2021 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: plummeted 33.77% in 2022, then surged 79.36% in 2024.
- H2O America's Construction in Progress stood at $176.4 million in 2021, then tumbled by 33.77% to $116.9 million in 2022, then fell by 8.45% to $107.0 million in 2023, then soared by 67.78% to $179.5 million in 2024, then skyrocketed by 50.02% to $269.3 million in 2025.
- Per Business Quant, the three most recent readings for HTO's Construction in Progress are $269.3 million (Q4 2025), $277.9 million (Q3 2025), and $241.8 million (Q2 2025).