Growth Metrics

H2O America (HTO) Construction in Progress (2016 - 2025)

Historic Construction in Progress for H2O America (HTO) over the last 16 years, with Q3 2025 value amounting to $277.9 million.

  • H2O America's Construction in Progress rose 3689.32% to $277.9 million in Q3 2025 from the same period last year, while for Sep 2025 it was $277.9 million, marking a year-over-year increase of 3689.32%. This contributed to the annual value of $179.5 million for FY2024, which is 6777.53% up from last year.
  • As of Q3 2025, H2O America's Construction in Progress stood at $277.9 million, which was up 3689.32% from $241.8 million recorded in Q2 2025.
  • Over the past 5 years, H2O America's Construction in Progress peaked at $277.9 million during Q3 2025, and registered a low of $107.0 million during Q4 2023.
  • Its 5-year average for Construction in Progress is $163.5 million, with a median of $159.1 million in 2024.
  • Per our database at Business Quant, H2O America's Construction in Progress plummeted by 3376.81% in 2022 and then skyrocketed by 7935.76% in 2024.
  • Over the past 5 years, H2O America's Construction in Progress (Quarter) stood at $176.4 million in 2021, then tumbled by 33.77% to $116.9 million in 2022, then decreased by 8.45% to $107.0 million in 2023, then skyrocketed by 67.78% to $179.5 million in 2024, then soared by 54.86% to $277.9 million in 2025.
  • Its Construction in Progress stands at $277.9 million for Q3 2025, versus $241.8 million for Q2 2025 and $199.0 million for Q1 2025.