Middlesex Water (MSEX) Construction in Progress (2016 - 2025)

Middlesex Water's Construction in Progress history spans 15 years, with the latest figure at $44.4 million for Q4 2025.

  • For Q4 2025, Construction in Progress rose 29.79% year-over-year to $44.4 million; the TTM value through Dec 2025 reached $44.4 million, up 29.79%, while the annual FY2025 figure was $44.4 million, 29.79% up from the prior year.
  • Construction in Progress for Q4 2025 was $44.4 million at Middlesex Water, up from $37.4 million in the prior quarter.
  • Across five years, Construction in Progress topped out at $89.7 million in Q1 2021 and bottomed at $19.3 million in Q3 2021.
  • The 5-year median for Construction in Progress is $37.1 million (2023), against an average of $40.6 million.
  • The largest annual shift saw Construction in Progress plummeted 73.72% in 2021 before it surged 206.85% in 2022.
  • A 5-year view of Construction in Progress shows it stood at $24.9 million in 2021, then surged by 114.74% to $53.6 million in 2022, then tumbled by 63.35% to $19.6 million in 2023, then surged by 74.22% to $34.2 million in 2024, then rose by 29.79% to $44.4 million in 2025.
  • Per Business Quant, the three most recent readings for MSEX's Construction in Progress are $44.4 million (Q4 2025), $37.4 million (Q3 2025), and $43.6 million (Q2 2025).