Growth Metrics

Consolidated Water (CWCO) Construction in Progress (2016 - 2025)

Consolidated Water (CWCO) has disclosed Construction in Progress for 16 consecutive years, with $5.2 million as the latest value for Q3 2025.

  • On a quarterly basis, Construction in Progress rose 86.15% to $5.2 million in Q3 2025 year-over-year; TTM through Sep 2025 was $5.2 million, a 86.15% increase, with the full-year FY2024 number at $5.1 million, up 938.15% from a year prior.
  • Construction in Progress was $5.2 million for Q3 2025 at Consolidated Water, down from $6.5 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $6.5 million in Q2 2025 to a low of $495471.0 in Q4 2023.
  • A 5-year average of $3.0 million and a median of $2.6 million in 2022 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: plummeted 86.63% in 2023, then soared 938.15% in 2024.
  • Consolidated Water's Construction in Progress stood at $710863.0 in 2021, then skyrocketed by 421.29% to $3.7 million in 2022, then tumbled by 86.63% to $495471.0 in 2023, then skyrocketed by 938.15% to $5.1 million in 2024, then rose by 1.3% to $5.2 million in 2025.
  • Per Business Quant, the three most recent readings for CWCO's Construction in Progress are $5.2 million (Q3 2025), $6.5 million (Q2 2025), and $4.5 million (Q1 2025).