Consolidated Water (CWCO) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Consolidated Water (CWCO) over the last 16 years, with Q3 2025 value amounting to $5.2 million.
- Consolidated Water's Construction in Progress rose 8614.8% to $5.2 million in Q3 2025 from the same period last year, while for Sep 2025 it was $5.2 million, marking a year-over-year increase of 8614.8%. This contributed to the annual value of $5.1 million for FY2024, which is 93814.69% up from last year.
- Per Consolidated Water's latest filing, its Construction in Progress stood at $5.2 million for Q3 2025, which was up 8614.8% from $6.5 million recorded in Q2 2025.
- Consolidated Water's Construction in Progress' 5-year high stood at $6.5 million during Q2 2025, with a 5-year trough of $495471.0 in Q4 2023.
- Over the past 5 years, Consolidated Water's median Construction in Progress value was $2.6 million (recorded in 2022), while the average stood at $3.0 million.
- As far as peak fluctuations go, Consolidated Water's Construction in Progress plummeted by 8662.94% in 2023, and later skyrocketed by 93814.69% in 2024.
- Quarter analysis of 5 years shows Consolidated Water's Construction in Progress stood at $710863.0 in 2021, then surged by 421.29% to $3.7 million in 2022, then tumbled by 86.63% to $495471.0 in 2023, then soared by 938.15% to $5.1 million in 2024, then grew by 1.3% to $5.2 million in 2025.
- Its Construction in Progress stands at $5.2 million for Q3 2025, versus $6.5 million for Q2 2025 and $4.5 million for Q1 2025.