Growth Metrics

Consolidated Water (CWCO) Construction in Progress (2016 - 2025)

Consolidated Water (CWCO) has disclosed Construction in Progress for 16 consecutive years, with $6.7 million as the latest value for Q4 2025.

  • Quarterly Construction in Progress rose 30.17% to $6.7 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $6.7 million through Dec 2025, up 30.17% year-over-year, with the annual reading at $6.7 million for FY2025, 30.17% up from the prior year.
  • Construction in Progress for Q4 2025 was $6.7 million at Consolidated Water, up from $5.2 million in the prior quarter.
  • The five-year high for Construction in Progress was $6.7 million in Q4 2025, with the low at $495471.0 in Q4 2023.
  • Average Construction in Progress over 5 years is $3.2 million, with a median of $2.7 million recorded in 2022.
  • The sharpest move saw Construction in Progress tumbled 86.63% in 2023, then skyrocketed 938.15% in 2024.
  • Over 5 years, Construction in Progress stood at $710863.0 in 2021, then surged by 421.29% to $3.7 million in 2022, then crashed by 86.63% to $495471.0 in 2023, then surged by 938.15% to $5.1 million in 2024, then surged by 30.17% to $6.7 million in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $6.7 million, $5.2 million, and $6.5 million for Q4 2025, Q3 2025, and Q2 2025 respectively.