Growth Metrics

American States Water (AWR) Construction in Progress (2016 - 2025)

American States Water (AWR) has disclosed Construction in Progress for 16 consecutive years, with $255.5 million as the latest value for Q4 2025.

  • On a quarterly basis, Construction in Progress fell 16.22% to $255.5 million in Q4 2025 year-over-year; TTM through Dec 2025 was $255.5 million, a 16.22% decrease, with the full-year FY2025 number at $255.5 million, down 16.22% from a year prior.
  • Construction in Progress was $255.5 million for Q4 2025 at American States Water, down from $304.9 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $304.9 million in Q4 2024 to a low of $167.9 million in Q4 2021.
  • A 5-year average of $229.4 million and a median of $237.1 million in 2023 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: surged 30.54% in 2023, then dropped 16.22% in 2025.
  • American States Water's Construction in Progress stood at $167.9 million in 2021, then increased by 8.18% to $181.6 million in 2022, then surged by 30.54% to $237.1 million in 2023, then grew by 28.59% to $304.9 million in 2024, then decreased by 16.22% to $255.5 million in 2025.
  • Per Business Quant, the three most recent readings for AWR's Construction in Progress are $255.5 million (Q4 2025), $304.9 million (Q4 2024), and $237.1 million (Q4 2023).