American States Water (AWR) Construction in Progress (2016 - 2024)
Historic Construction in Progress for American States Water (AWR) over the last 16 years, with Q4 2024 value amounting to $304.9 million.
- American States Water's Construction in Progress rose 2859.09% to $304.9 million in Q4 2024 from the same period last year, while for Dec 2024 it was $304.9 million, marking a year-over-year increase of 2859.09%. This contributed to the annual value of $304.9 million for FY2024, which is 2859.09% up from last year.
- Latest data reveals that American States Water reported Construction in Progress of $304.9 million as of Q4 2024, which was up 2859.09% from $237.1 million recorded in Q4 2023.
- In the past 5 years, American States Water's Construction in Progress ranged from a high of $304.9 million in Q4 2024 and a low of $150.1 million during Q4 2020
- For the 5-year period, American States Water's Construction in Progress averaged around $208.4 million, with its median value being $181.6 million (2022).
- Its Construction in Progress has fluctuated over the past 5 years, first surged by 817.85% in 2022, then surged by 3054.42% in 2023.
- Quarter analysis of 5 years shows American States Water's Construction in Progress stood at $150.1 million in 2020, then grew by 11.84% to $167.9 million in 2021, then increased by 8.18% to $181.6 million in 2022, then skyrocketed by 30.54% to $237.1 million in 2023, then rose by 28.59% to $304.9 million in 2024.
- Its last three reported values are $304.9 million in Q4 2024, $237.1 million for Q4 2023, and $181.6 million during Q4 2022.