Growth Metrics

Pacific Airport (PAC) Restructuring Costs (2024)

Pacific Airport's Restructuring Costs history spans 1 years, with the latest figure at $979.2 million for Q4 2024.

  • On a quarterly basis, Restructuring Costs changed N/A to $979.2 million in Q4 2024 year-over-year; TTM through Dec 2024 was $979.2 million, a N/A change, with the full-year FY2024 number at $979.2 million, changed N/A from a year prior.
  • Restructuring Costs hit $979.2 million in Q4 2024 for Pacific Airport.
  • Over the last five years, Restructuring Costs for PAC hit a ceiling of $979.2 million in Q4 2024 and a floor of $979.2 million in Q4 2024.