Growth Metrics

Pacific Airport (PAC) Construction in Progress (2016 - 2025)

Pacific Airport's Construction in Progress history spans 11 years, with the latest figure at $790.5 million for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 33.27% to $790.5 million in Q4 2025 year-over-year; TTM through Dec 2025 was $790.5 million, a 33.27% increase, with the full-year FY2025 number at $754.8 million, up 27.25% from a year prior.
  • Construction in Progress hit $790.5 million in Q4 2025 for Pacific Airport, up from $593.2 million in the prior quarter.
  • Over the last five years, Construction in Progress for PAC hit a ceiling of $790.5 million in Q4 2025 and a floor of $258.2 million in Q4 2021.
  • Historically, Construction in Progress has averaged $536.2 million across 5 years, with a median of $593.2 million in 2024.
  • Biggest five-year swings in Construction in Progress: soared 111.19% in 2023 and later dropped 15.87% in 2024.
  • Tracing PAC's Construction in Progress over 5 years: stood at $258.2 million in 2021, then grew by 29.32% to $333.9 million in 2022, then surged by 111.19% to $705.1 million in 2023, then decreased by 15.87% to $593.2 million in 2024, then skyrocketed by 33.27% to $790.5 million in 2025.
  • Business Quant data shows Construction in Progress for PAC at $790.5 million in Q4 2025, $593.2 million in Q4 2024, and $705.1 million in Q4 2023.