Growth Metrics

Otter Tail (OTTR) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Otter Tail (OTTR) over the last 14 years, with Q4 2024 value amounting to $231.9 million.

  • Otter Tail's Construction in Progress rose 6900.13% to $231.9 million in Q4 2024 from the same period last year, while for Dec 2024 it was $231.9 million, marking a year-over-year increase of 6900.13%. This contributed to the annual value of $231.9 million for FY2024, which is 6900.13% up from last year.
  • Per Otter Tail's latest filing, its Construction in Progress stood at $231.9 million for Q4 2024, which was up 6900.13% from $137.2 million recorded in Q4 2023.
  • In the past 5 years, Otter Tail's Construction in Progress registered a high of $454.1 million during Q3 2020, and its lowest value of $137.2 million during Q4 2023.
  • For the 3-year period, Otter Tail's Construction in Progress averaged around $275.8 million, with its median value being $234.0 million (2020).
  • Per our database at Business Quant, Otter Tail's Construction in Progress soared by 37707.63% in 2020 and then skyrocketed by 6900.13% in 2024.
  • Quarter analysis of 3 years shows Otter Tail's Construction in Progress stood at $454.1 million in 2020, then crashed by 69.79% to $137.2 million in 2023, then skyrocketed by 69.0% to $231.9 million in 2024.
  • Its Construction in Progress stands at $231.9 million for Q4 2024, versus $137.2 million for Q4 2023 and $454.1 million for Q3 2020.