Duke Energy (DUK) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Duke Energy (DUK) over the last 16 years, with Q4 2024 value amounting to $7.8 billion.
- Duke Energy's Construction in Progress fell 623.51% to $7.8 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $7.8 billion, marking a year-over-year decrease of 623.51%. This contributed to the annual value of $7.8 billion for FY2024, which is 623.51% down from last year.
- Latest data reveals that Duke Energy reported Construction in Progress of $7.8 billion as of Q4 2024, which was down 623.51% from $8.4 billion recorded in Q4 2023.
- Duke Energy's 5-year Construction in Progress high stood at $8.4 billion for Q4 2023, and its period low was $6.0 billion during Q4 2021.
- Moreover, its 5-year median value for Construction in Progress was $7.4 billion (2022), whereas its average is $7.2 billion.
- Its Construction in Progress has fluctuated over the past 5 years, first plummeted by 1002.26% in 2021, then skyrocketed by 2344.87% in 2022.
- Duke Energy's Construction in Progress (Quarter) stood at $6.6 billion in 2020, then decreased by 10.02% to $6.0 billion in 2021, then grew by 23.45% to $7.4 billion in 2022, then increased by 13.43% to $8.4 billion in 2023, then fell by 6.24% to $7.8 billion in 2024.
- Its Construction in Progress stands at $7.8 billion for Q4 2024, versus $8.4 billion for Q4 2023 and $7.4 billion for Q4 2022.