Exelon (EXC) Construction in Progress (2018 - 2021)
Historic Construction in Progress for Exelon (EXC) over the last 4 years, with Q2 2021 value amounting to $42.0 million.
- Exelon's Construction in Progress fell 4473.68% to $42.0 million in Q2 2021 from the same period last year, while for Jun 2021 it was $42.0 million, marking a year-over-year decrease of 4473.68%. This contributed to the annual value of $61.0 million for FY2020, which is N/A changed from last year.
- Per Exelon's latest filing, its Construction in Progress stood at $42.0 million for Q2 2021, which was down 4473.68% from $103.0 million recorded in Q1 2021.
- Exelon's 5-year Construction in Progress high stood at $103.0 million for Q1 2021, and its period low was $2.0 million during Q1 2019.
- Over the past 4 years, Exelon's median Construction in Progress value was $42.0 million (recorded in 2021), while the average stood at $44.0 million.
- Its Construction in Progress has fluctuated over the past 5 years, first plummeted by 7941.18% in 2019, then soared by 340000.0% in 2020.
- Exelon's Construction in Progress (Quarter) stood at $44.0 million in 2018, then crashed by 84.09% to $7.0 million in 2019, then surged by 771.43% to $61.0 million in 2020, then tumbled by 31.15% to $42.0 million in 2021.
- Its last three reported values are $42.0 million in Q2 2021, $103.0 million for Q1 2021, and $61.0 million during Q4 2020.