Xcel Energy (XEL) Construction in Progress (2023 - 2025)
Xcel Energy (XEL) has disclosed Construction in Progress for 5 consecutive years, with $8.0 billion as the latest value for Q3 2025.
- Quarterly Construction in Progress rose 65.26% to $8.0 billion in Q3 2025 from the year-ago period, while the trailing twelve-month figure was $8.0 billion through Sep 2025, up 65.26% year-over-year, with the annual reading at $4.7 billion for FY2024, 64.29% up from the prior year.
- Construction in Progress hit $8.0 billion in Q3 2025 for Xcel Energy, up from $6.6 billion in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $8.0 billion in Q3 2025 to a low of $2.9 billion in Q4 2023.
- Historically, Construction in Progress has averaged $5.5 billion across 3 years, with a median of $5.4 billion in 2024.
- Biggest five-year swings in Construction in Progress: soared 64.29% in 2024 and later skyrocketed 65.26% in 2025.
- Year by year, Construction in Progress stood at $2.9 billion in 2023, then skyrocketed by 64.29% to $4.7 billion in 2024, then surged by 69.85% to $8.0 billion in 2025.
- Business Quant data shows Construction in Progress for XEL at $8.0 billion in Q3 2025, $6.6 billion in Q2 2025, and $6.0 billion in Q1 2025.