Dominion Energy (D) Construction in Progress (2016 - 2025)

Dominion Energy's Construction in Progress history spans 13 years, with the latest figure at $19.2 billion for Q4 2025.

  • For Q4 2025, Construction in Progress rose 38.96% year-over-year to $19.2 billion; the TTM value through Dec 2025 reached $19.2 billion, up 38.96%, while the annual FY2025 figure was $19.2 billion, 38.96% up from the prior year.
  • Construction in Progress reached $19.2 billion in Q4 2025 per D's latest filing, up from $13.8 billion in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $19.2 billion in Q4 2025 to a low of $3.9 billion in Q4 2021.
  • Average Construction in Progress over 5 years is $10.1 billion, with a median of $8.2 billion recorded in 2023.
  • Peak YoY movement for Construction in Progress: rose 16.36% in 2021, then skyrocketed 67.87% in 2024.
  • A 5-year view of Construction in Progress shows it stood at $3.9 billion in 2021, then soared by 36.17% to $5.3 billion in 2022, then skyrocketed by 55.05% to $8.2 billion in 2023, then surged by 67.87% to $13.8 billion in 2024, then skyrocketed by 38.96% to $19.2 billion in 2025.
  • Per Business Quant, the three most recent readings for D's Construction in Progress are $19.2 billion (Q4 2025), $13.8 billion (Q4 2024), and $8.2 billion (Q4 2023).