Growth Metrics

Entergy (ETR) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Entergy (ETR) over the last 17 years, with Q3 2025 value amounting to $5.8 billion.

  • Entergy's Construction in Progress rose 6700.07% to $5.8 billion in Q3 2025 from the same period last year, while for Sep 2025 it was $5.8 billion, marking a year-over-year increase of 6700.07%. This contributed to the annual value of $3.2 billion for FY2024, which is 5195.77% up from last year.
  • Latest data reveals that Entergy reported Construction in Progress of $5.8 billion as of Q3 2025, which was up 6700.07% from $5.0 billion recorded in Q2 2025.
  • Entergy's Construction in Progress' 5-year high stood at $5.8 billion during Q3 2025, with a 5-year trough of $1.3 billion in Q1 2021.
  • For the 5-year period, Entergy's Construction in Progress averaged around $2.6 billion, with its median value being $2.2 billion (2023).
  • In the last 5 years, Entergy's Construction in Progress plummeted by 4686.4% in 2021 and then skyrocketed by 9378.92% in 2025.
  • Entergy's Construction in Progress (Quarter) stood at $1.5 billion in 2021, then rose by 21.97% to $1.8 billion in 2022, then increased by 14.41% to $2.1 billion in 2023, then surged by 51.96% to $3.2 billion in 2024, then soared by 81.05% to $5.8 billion in 2025.
  • Its last three reported values are $5.8 billion in Q3 2025, $5.0 billion for Q2 2025, and $4.4 billion during Q1 2025.