Growth Metrics

Flowers Foods (FLO) Construction in Progress (2016 - 2026)

Flowers Foods has reported Construction in Progress over the past 14 years, most recently at $63.5 million for Q1 2026.

  • Quarterly Construction in Progress rose 4.91% to $63.5 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $63.5 million through Jan 2026, up 4.91% year-over-year, with the annual reading at $63.5 million for FY2026, 4.91% up from the prior year.
  • Construction in Progress was $63.5 million for Q1 2026 at Flowers Foods, up from $60.6 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $137.6 million in Q4 2022 and troughed at $58.6 million in Q4 2023.
  • The 4-year median for Construction in Progress is $63.5 million (2026), against an average of $81.5 million.
  • Year-over-year, Construction in Progress skyrocketed 57.53% in 2022 and then crashed 57.43% in 2023.
  • A 4-year view of Construction in Progress shows it stood at $137.6 million in 2022, then crashed by 57.43% to $58.6 million in 2023, then increased by 3.36% to $60.6 million in 2024, then increased by 4.91% to $63.5 million in 2026.
  • Per Business Quant, the three most recent readings for FLO's Construction in Progress are $63.5 million (Q1 2026), $60.6 million (Q4 2024), and $58.6 million (Q4 2023).