Growth Metrics

Flowers Foods (FLO) Construction in Progress (2016 - 2026)

Flowers Foods (FLO) has disclosed Construction in Progress for 14 consecutive years, with $63.5 million as the latest value for Q1 2026.

  • On a quarterly basis, Construction in Progress rose 4.91% to $63.5 million in Q1 2026 year-over-year; TTM through Jan 2026 was $63.5 million, a 4.91% increase, with the full-year FY2026 number at $63.5 million, up 4.91% from a year prior.
  • Construction in Progress was $63.5 million for Q1 2026 at Flowers Foods, up from $60.6 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $137.6 million in Q4 2022 to a low of $58.6 million in Q4 2023.
  • A 4-year average of $81.5 million and a median of $63.5 million in 2026 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: skyrocketed 57.53% in 2022, then crashed 57.43% in 2023.
  • Flowers Foods' Construction in Progress stood at $137.6 million in 2022, then plummeted by 57.43% to $58.6 million in 2023, then rose by 3.36% to $60.6 million in 2024, then rose by 4.91% to $63.5 million in 2026.
  • Per Business Quant, the three most recent readings for FLO's Construction in Progress are $63.5 million (Q1 2026), $60.6 million (Q4 2024), and $58.6 million (Q4 2023).