Growth Metrics

Flowers Foods (FLO) Construction in Progress (2016 - 2026)

Flowers Foods (FLO) has disclosed Construction in Progress for 14 consecutive years, with $63.5 million as the latest value for Q1 2026.

  • Quarterly Construction in Progress rose 4.91% to $63.5 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $63.5 million through Jan 2026, up 4.91% year-over-year, with the annual reading at $63.5 million for FY2026, 4.91% up from the prior year.
  • Construction in Progress for Q1 2026 was $63.5 million at Flowers Foods, up from $60.6 million in the prior quarter.
  • The five-year high for Construction in Progress was $137.6 million in Q4 2022, with the low at $58.6 million in Q4 2023.
  • Average Construction in Progress over 4 years is $81.5 million, with a median of $63.5 million recorded in 2026.
  • The sharpest move saw Construction in Progress surged 57.53% in 2022, then plummeted 57.43% in 2023.
  • Over 4 years, Construction in Progress stood at $137.6 million in 2022, then tumbled by 57.43% to $58.6 million in 2023, then grew by 3.36% to $60.6 million in 2024, then grew by 4.91% to $63.5 million in 2026.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $63.5 million, $60.6 million, and $58.6 million for Q1 2026, Q4 2024, and Q4 2023 respectively.