Growth Metrics

Hormel Foods (HRL) Construction in Progress (2016 - 2026)

Hormel Foods has reported Construction in Progress over the past 18 years, most recently at $283.2 million for Q1 2026.

  • Quarterly Construction in Progress rose 4.82% to $283.2 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $283.2 million through Jan 2026, up 4.82% year-over-year, with the annual reading at $286.5 million for FY2025, 25.24% up from the prior year.
  • Construction in Progress was $283.2 million for Q1 2026 at Hormel Foods, down from $286.5 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $330.4 million in Q3 2025 and troughed at $195.7 million in Q4 2023.
  • The 5-year median for Construction in Progress is $241.7 million (2024), against an average of $254.3 million.
  • Year-over-year, Construction in Progress tumbled 36.59% in 2023 and then rose 26.95% in 2024.
  • A 5-year view of Construction in Progress shows it stood at $216.2 million in 2022, then dropped by 9.52% to $195.7 million in 2023, then increased by 16.9% to $228.7 million in 2024, then increased by 25.24% to $286.5 million in 2025, then decreased by 1.12% to $283.2 million in 2026.
  • Per Business Quant, the three most recent readings for HRL's Construction in Progress are $283.2 million (Q1 2026), $286.5 million (Q4 2025), and $330.4 million (Q3 2025).