Growth Metrics

Hormel Foods (HRL) Construction in Progress (2016 - 2026)

Hormel Foods (HRL) has disclosed Construction in Progress for 18 consecutive years, with $283.2 million as the latest value for Q1 2026.

  • On a quarterly basis, Construction in Progress rose 4.82% to $283.2 million in Q1 2026 year-over-year; TTM through Jan 2026 was $283.2 million, a 4.82% increase, with the full-year FY2025 number at $286.5 million, up 25.24% from a year prior.
  • Construction in Progress was $283.2 million for Q1 2026 at Hormel Foods, down from $286.5 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $330.4 million in Q3 2025 to a low of $195.7 million in Q4 2023.
  • A 5-year average of $254.3 million and a median of $241.7 million in 2024 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: tumbled 36.59% in 2023, then rose 26.95% in 2024.
  • Hormel Foods' Construction in Progress stood at $216.2 million in 2022, then decreased by 9.52% to $195.7 million in 2023, then rose by 16.9% to $228.7 million in 2024, then rose by 25.24% to $286.5 million in 2025, then fell by 1.12% to $283.2 million in 2026.
  • Per Business Quant, the three most recent readings for HRL's Construction in Progress are $283.2 million (Q1 2026), $286.5 million (Q4 2025), and $330.4 million (Q3 2025).