Hormel Foods (HRL) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Hormel Foods (HRL) over the last 17 years, with Q4 2025 value amounting to $286.5 million.

  • Hormel Foods' Construction in Progress rose 2524.42% to $286.5 million in Q4 2025 from the same period last year, while for Oct 2025 it was $286.5 million, marking a year-over-year increase of 2524.42%. This contributed to the annual value of $286.5 million for FY2025, which is 2524.42% up from last year.
  • As of Q4 2025, Hormel Foods' Construction in Progress stood at $286.5 million, which was up 2524.42% from $330.4 million recorded in Q3 2025.
  • In the past 5 years, Hormel Foods' Construction in Progress registered a high of $389.5 million during Q1 2021, and its lowest value of $195.7 million during Q4 2023.
  • Moreover, its 5-year median value for Construction in Progress was $260.6 million (2021), whereas its average is $263.3 million.
  • In the last 5 years, Hormel Foods' Construction in Progress skyrocketed by 4137.2% in 2021 and then plummeted by 3659.32% in 2023.
  • Quarter analysis of 5 years shows Hormel Foods' Construction in Progress stood at $316.5 million in 2021, then plummeted by 31.67% to $216.2 million in 2022, then decreased by 9.52% to $195.7 million in 2023, then rose by 16.9% to $228.7 million in 2024, then rose by 25.24% to $286.5 million in 2025.
  • Its Construction in Progress stands at $286.5 million for Q4 2025, versus $330.4 million for Q3 2025 and $297.7 million for Q2 2025.