Kraft Heinz (KHC) Construction in Progress (2016 - 2019)
Historic Construction in Progress for Kraft Heinz (KHC) over the last 6 years, with Q4 2019 value amounting to $1.0 billion.
- Kraft Heinz's Construction in Progress fell 1133.05% to $1.0 billion in Q4 2019 from the same period last year, while for Dec 2019 it was $1.0 billion, marking a year-over-year decrease of 1133.05%. This contributed to the annual value of $1.0 billion for FY2019, which is 1133.05% down from last year.
- Per Kraft Heinz's latest filing, its Construction in Progress stood at $1.0 billion for Q4 2019, which was down 1133.05% from $1.2 billion recorded in Q4 2018.
- In the past 5 years, Kraft Heinz's Construction in Progress ranged from a high of $1.6 billion in Q4 2016 and a low of $824.0 million during Q3 2015
- Over the past 5 years, Kraft Heinz's median Construction in Progress value was $1.1 billion (recorded in 2018), while the average stood at $1.2 billion.
- As far as peak fluctuations go, Kraft Heinz's Construction in Progress surged by 27773.58% in 2016, and later tumbled by 1593.75% in 2017.
- Quarter analysis of 5 years shows Kraft Heinz's Construction in Progress stood at $824.0 million in 2015, then soared by 94.17% to $1.6 billion in 2016, then decreased by 15.94% to $1.3 billion in 2017, then dropped by 13.38% to $1.2 billion in 2018, then dropped by 11.33% to $1.0 billion in 2019.
- Its Construction in Progress was $1.0 billion in Q4 2019, compared to $1.2 billion in Q4 2018 and $1.3 billion in Q4 2017.