J M Smucker (SJM) Construction in Progress (2016 - 2026)

J M Smucker's Construction in Progress history spans 17 years, with the latest figure at $547.9 million for Q1 2026.

  • For Q1 2026, Construction in Progress fell 23.06% year-over-year to $547.9 million; the TTM value through Jan 2026 reached $547.9 million, down 23.06%, while the annual FY2025 figure was $619.4 million, 32.06% down from the prior year.
  • Construction in Progress reached $547.9 million in Q1 2026 per SJM's latest filing, down from $558.7 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $911.7 million in Q2 2024 to a low of $406.3 million in Q1 2022.
  • Average Construction in Progress over 5 years is $635.0 million, with a median of $619.4 million recorded in 2025.
  • Peak YoY movement for Construction in Progress: surged 86.96% in 2022, then crashed 34.55% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $409.2 million in 2022, then skyrocketed by 82.45% to $746.6 million in 2023, then decreased by 0.91% to $739.8 million in 2024, then decreased by 24.48% to $558.7 million in 2025, then fell by 1.93% to $547.9 million in 2026.
  • Per Business Quant, the three most recent readings for SJM's Construction in Progress are $547.9 million (Q1 2026), $558.7 million (Q4 2025), and $545.8 million (Q3 2025).