Growth Metrics

J M Smucker (SJM) Construction in Progress (2016 - 2026)

J M Smucker filings provide 17 years of Construction in Progress readings, the most recent being $547.9 million for Q1 2026.

  • On a quarterly basis, Construction in Progress fell 23.06% to $547.9 million in Q1 2026 year-over-year; TTM through Jan 2026 was $547.9 million, a 23.06% decrease, with the full-year FY2025 number at $619.4 million, down 32.06% from a year prior.
  • Construction in Progress hit $547.9 million in Q1 2026 for J M Smucker, down from $558.7 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $911.7 million in Q2 2024 to a low of $406.3 million in Q1 2022.
  • Median Construction in Progress over the past 5 years was $619.4 million (2025), compared with a mean of $635.0 million.
  • Biggest five-year swings in Construction in Progress: soared 86.96% in 2022 and later plummeted 34.55% in 2025.
  • J M Smucker's Construction in Progress stood at $409.2 million in 2022, then skyrocketed by 82.45% to $746.6 million in 2023, then decreased by 0.91% to $739.8 million in 2024, then decreased by 24.48% to $558.7 million in 2025, then fell by 1.93% to $547.9 million in 2026.
  • The last three reported values for Construction in Progress were $547.9 million (Q1 2026), $558.7 million (Q4 2025), and $545.8 million (Q3 2025) per Business Quant data.