J M Smucker (SJM) Construction in Progress (2017 - 2021)
Historic Construction in Progress for J M Smucker (SJM) over the last 12 years, with Q1 2021 value amounting to $252.7 million.
- J M Smucker's Construction in Progress rose 2965.62% to $252.7 million in Q1 2021 from the same period last year, while for Jan 2021 it was $252.7 million, marking a year-over-year increase of 2965.62%. This contributed to the annual value of $232.6 million for FY2020, which is 2771.91% down from last year.
- Latest data reveals that J M Smucker reported Construction in Progress of $252.7 million as of Q1 2021, which was up 2965.62% from $205.7 million recorded in Q4 2020.
- J M Smucker's 5-year Construction in Progress high stood at $325.5 million for Q1 2019, and its period low was $98.7 million during Q3 2017.
- In the last 5 years, J M Smucker's Construction in Progress had a median value of $212.1 million in 2018 and averaged $213.9 million.
- In the last 5 years, J M Smucker's Construction in Progress skyrocketed by 17159.2% in 2018 and then plummeted by 4012.29% in 2020.
- Over the past 5 years, J M Smucker's Construction in Progress (Quarter) stood at $104.9 million in 2017, then surged by 171.59% to $284.9 million in 2018, then tumbled by 39.77% to $171.6 million in 2019, then rose by 19.87% to $205.7 million in 2020, then grew by 22.85% to $252.7 million in 2021.
- Its last three reported values are $252.7 million in Q1 2021, $205.7 million for Q4 2020, and $217.5 million during Q3 2020.