Unilever (UL) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Unilever (UL) over the last 9 years, with Q4 2024 value amounting to $1.7 billion.
- Unilever's Construction in Progress rose 2769.38% to $1.7 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $1.7 billion, marking a year-over-year increase of 2769.38%. This contributed to the annual value of $1.7 billion for FY2024, which is 2769.38% up from last year.
- According to the latest figures from Q4 2024, Unilever's Construction in Progress is $1.7 billion, which was up 2769.38% from $1.3 billion recorded in Q4 2023.
- Unilever's Construction in Progress' 5-year high stood at $1.7 billion during Q4 2024, with a 5-year trough of $876.3 million in Q4 2020.
- Over the past 5 years, Unilever's median Construction in Progress value was $1.1 billion (recorded in 2021), while the average stood at $1.2 billion.
- As far as peak fluctuations go, Unilever's Construction in Progress crashed by 1666.22% in 2020, and later soared by 2769.38% in 2024.
- Over the past 5 years, Unilever's Construction in Progress (Quarter) stood at $876.3 million in 2020, then increased by 27.15% to $1.1 billion in 2021, then dropped by 2.57% to $1.1 billion in 2022, then rose by 23.5% to $1.3 billion in 2023, then rose by 27.69% to $1.7 billion in 2024.
- Its last three reported values are $1.7 billion in Q4 2024, $1.3 billion for Q4 2023, and $1.1 billion during Q4 2022.