Unilever (UL) Construction in Progress (2016 - 2025)

Unilever has reported Construction in Progress over the past 10 years, most recently at $1.9 billion for Q4 2025.

  • Quarterly results put Construction in Progress at $1.9 billion for Q4 2025, up 32.26% from a year ago — trailing twelve months through Dec 2025 was $1.9 billion (up 32.26% YoY), and the annual figure for FY2025 was $1.9 billion, up 28.37%.
  • Construction in Progress for Q4 2025 was $1.9 billion at Unilever, up from $1.5 billion in the prior quarter.
  • Over the last five years, Construction in Progress for UL hit a ceiling of $1.9 billion in Q4 2025 and a floor of $106.1 million in Q4 2022.
  • Median Construction in Progress over the past 5 years was $1.1 billion (2023), compared with a mean of $1.1 billion.
  • Biggest five-year swings in Construction in Progress: tumbled 89.47% in 2022 and later skyrocketed 971.83% in 2023.
  • Unilever's Construction in Progress stood at $1.0 billion in 2021, then tumbled by 89.47% to $106.1 million in 2022, then skyrocketed by 971.83% to $1.1 billion in 2023, then increased by 28.54% to $1.5 billion in 2024, then soared by 32.26% to $1.9 billion in 2025.
  • The last three reported values for Construction in Progress were $1.9 billion (Q4 2025), $1.5 billion (Q4 2024), and $1.1 billion (Q4 2023) per Business Quant data.