Brp (DOO) Construction in Progress (2018 - 2026)
Brp (DOO) has disclosed Construction in Progress for 9 consecutive years, with $70.8 million as the latest value for Q1 2026.
- Quarterly Construction in Progress fell 43.18% to $70.8 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $70.8 million through Jan 2026, down 43.18% year-over-year, with the annual reading at $70.5 million for FY2026, 45.06% down from the prior year.
- Construction in Progress for Q1 2026 was $70.8 million at Brp, down from $124.5 million in the prior quarter.
- The five-year high for Construction in Progress was $160.7 million in Q1 2024, with the low at $70.8 million in Q1 2026.
- Average Construction in Progress over 5 years is $123.1 million, with a median of $124.5 million recorded in 2025.
- The sharpest move saw Construction in Progress skyrocketed 38.37% in 2022, then crashed 43.18% in 2026.
- Over 5 years, Construction in Progress stood at $111.3 million in 2022, then skyrocketed by 33.0% to $148.1 million in 2023, then grew by 8.57% to $160.7 million in 2024, then dropped by 22.52% to $124.5 million in 2025, then plummeted by 43.18% to $70.8 million in 2026.
- According to Business Quant data, Construction in Progress over the past three periods came in at $70.8 million, $124.5 million, and $160.7 million for Q1 2026, Q1 2025, and Q1 2024 respectively.