Growth Metrics

Wec Energy (WEC) Construction in Progress (2016 - 2025)

Wec Energy's Construction in Progress history spans 17 years, with the latest figure at $3.4 billion for Q4 2025.

  • For Q4 2025, Construction in Progress rose 103.46% year-over-year to $3.4 billion; the TTM value through Dec 2025 reached $3.4 billion, up 103.46%, while the annual FY2025 figure was $3.4 billion, 103.46% up from the prior year.
  • Construction in Progress reached $3.4 billion in Q4 2025 per WEC's latest filing, up from $1.7 billion in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $3.4 billion in Q4 2025 to a low of $29.8 million in Q4 2021.
  • Average Construction in Progress over 5 years is $1.2 billion, with a median of $1.1 billion recorded in 2023.
  • Peak YoY movement for Construction in Progress: plummeted 95.64% in 2021, then skyrocketed 1270.47% in 2023.
  • A 5-year view of Construction in Progress shows it stood at $29.8 million in 2021, then skyrocketed by 173.83% to $81.6 million in 2022, then surged by 1270.47% to $1.1 billion in 2023, then soared by 47.87% to $1.7 billion in 2024, then surged by 103.46% to $3.4 billion in 2025.
  • Per Business Quant, the three most recent readings for WEC's Construction in Progress are $3.4 billion (Q4 2025), $1.7 billion (Q4 2024), and $1.1 billion (Q4 2023).