Growth Metrics

Wec Energy (WEC) Construction in Progress (2016 - 2025)

Wec Energy filings provide 17 years of Construction in Progress readings, the most recent being $3.4 billion for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 103.46% to $3.4 billion in Q4 2025 year-over-year; TTM through Dec 2025 was $3.4 billion, a 103.46% increase, with the full-year FY2025 number at $3.4 billion, up 103.46% from a year prior.
  • Construction in Progress hit $3.4 billion in Q4 2025 for Wec Energy, up from $1.7 billion in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $3.4 billion in Q4 2025 to a low of $29.8 million in Q4 2021.
  • Median Construction in Progress over the past 5 years was $1.1 billion (2023), compared with a mean of $1.2 billion.
  • Biggest five-year swings in Construction in Progress: tumbled 95.64% in 2021 and later surged 1270.47% in 2023.
  • Wec Energy's Construction in Progress stood at $29.8 million in 2021, then skyrocketed by 173.83% to $81.6 million in 2022, then surged by 1270.47% to $1.1 billion in 2023, then soared by 47.87% to $1.7 billion in 2024, then surged by 103.46% to $3.4 billion in 2025.
  • The last three reported values for Construction in Progress were $3.4 billion (Q4 2025), $1.7 billion (Q4 2024), and $1.1 billion (Q4 2023) per Business Quant data.