Growth Metrics

Txnm Energy (TXNM) Construction in Progress (2016 - 2024)

Txnm Energy's Construction in Progress history spans 14 years, with the latest figure at $727.1 million for Q2 2024.

  • For Q2 2024, Construction in Progress rose 22.41% year-over-year to $727.1 million; the TTM value through Jun 2024 reached $727.1 million, up 22.41%, while the annual FY2023 figure was $589.8 million, 58.14% up from the prior year.
  • Construction in Progress reached $727.1 million in Q2 2024 per TXNM's latest filing, up from $693.5 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $727.1 million in Q2 2024 to a low of $218.7 million in Q4 2020.
  • Average Construction in Progress over 5 years is $427.7 million, with a median of $376.4 million recorded in 2020.
  • Peak YoY movement for Construction in Progress: decreased 7.83% in 2021, then surged 58.14% in 2023.
  • A 5-year view of Construction in Progress shows it stood at $218.7 million in 2020, then increased by 13.78% to $248.9 million in 2021, then surged by 49.88% to $373.0 million in 2022, then surged by 58.14% to $589.8 million in 2023, then grew by 23.28% to $727.1 million in 2024.
  • Per Business Quant, the three most recent readings for TXNM's Construction in Progress are $727.1 million (Q2 2024), $693.5 million (Q1 2024), and $589.8 million (Q4 2023).