Txnm Energy (TXNM) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Txnm Energy (TXNM) over the last 15 years, with Q3 2025 value amounting to $791.8 million.
- Txnm Energy's Construction in Progress fell 297.77% to $791.8 million in Q3 2025 from the same period last year, while for Sep 2025 it was $791.8 million, marking a year-over-year decrease of 297.77%. This contributed to the annual value of $496.0 million for FY2024, which is 1591.26% down from last year.
- Latest data reveals that Txnm Energy reported Construction in Progress of $791.8 million as of Q3 2025, which was down 297.77% from $677.9 million recorded in Q2 2025.
- In the past 5 years, Txnm Energy's Construction in Progress ranged from a high of $816.1 million in Q3 2024 and a low of $248.9 million during Q4 2021
- Moreover, its 5-year median value for Construction in Progress was $496.0 million (2024), whereas its average is $524.7 million.
- Its Construction in Progress has fluctuated over the past 5 years, first skyrocketed by 5813.75% in 2023, then plummeted by 1591.26% in 2024.
- Txnm Energy's Construction in Progress (Quarter) stood at $248.9 million in 2021, then soared by 49.88% to $373.0 million in 2022, then surged by 58.14% to $589.8 million in 2023, then fell by 15.91% to $496.0 million in 2024, then skyrocketed by 59.65% to $791.8 million in 2025.
- Its last three reported values are $791.8 million in Q3 2025, $677.9 million for Q2 2025, and $637.3 million during Q1 2025.