Southwest Gas Holdings (SWX) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Southwest Gas Holdings (SWX) over the last 11 years, with Q3 2025 value amounting to $231.1 million.
- Southwest Gas Holdings' Construction in Progress fell 504.57% to $231.1 million in Q3 2025 from the same period last year, while for Sep 2025 it was $231.1 million, marking a year-over-year decrease of 504.57%. This contributed to the annual value of $178.6 million for FY2024, which is 1092.1% down from last year.
- Per Southwest Gas Holdings' latest filing, its Construction in Progress stood at $231.1 million for Q3 2025, which was down 504.57% from $201.2 million recorded in Q2 2025.
- In the past 5 years, Southwest Gas Holdings' Construction in Progress registered a high of $273.7 million during Q3 2022, and its lowest value of $151.4 million during Q2 2021.
- For the 5-year period, Southwest Gas Holdings' Construction in Progress averaged around $218.8 million, with its median value being $218.6 million (2022).
- As far as peak fluctuations go, Southwest Gas Holdings' Construction in Progress crashed by 3378.57% in 2021, and later skyrocketed by 7874.72% in 2022.
- Over the past 5 years, Southwest Gas Holdings' Construction in Progress (Quarter) stood at $202.1 million in 2021, then grew by 21.12% to $244.8 million in 2022, then fell by 18.06% to $200.5 million in 2023, then dropped by 10.92% to $178.6 million in 2024, then grew by 29.36% to $231.1 million in 2025.
- Its Construction in Progress was $231.1 million in Q3 2025, compared to $201.2 million in Q2 2025 and $176.5 million in Q1 2025.