Rgc Resources (RGCO) Construction in Progress (2016 - 2025)
Rgc Resources has reported Construction in Progress over the past 16 years, most recently at $8.6 million for Q4 2025.
- Quarterly results put Construction in Progress at $8.6 million for Q4 2025, down 12.81% from a year ago — trailing twelve months through Dec 2025 was $8.6 million (down 12.81% YoY), and the annual figure for FY2025 was $8.2 million, down 5.08%.
- Construction in Progress for Q4 2025 was $8.6 million at Rgc Resources, up from $8.2 million in the prior quarter.
- Over the last five years, Construction in Progress for RGCO hit a ceiling of $26.1 million in Q2 2023 and a floor of $8.1 million in Q1 2025.
- Median Construction in Progress over the past 5 years was $14.7 million (2023), compared with a mean of $15.0 million.
- Biggest five-year swings in Construction in Progress: skyrocketed 40.19% in 2023 and later plummeted 50.67% in 2024.
- Rgc Resources' Construction in Progress stood at $16.3 million in 2021, then skyrocketed by 32.66% to $21.6 million in 2022, then plummeted by 32.88% to $14.5 million in 2023, then crashed by 32.06% to $9.9 million in 2024, then dropped by 12.81% to $8.6 million in 2025.
- The last three reported values for Construction in Progress were $8.6 million (Q4 2025), $8.2 million (Q3 2025), and $9.7 million (Q2 2025) per Business Quant data.