Portland General Electric (POR) Construction in Progress (2016 - 2026)

Portland General Electric filings provide 12 years of Construction in Progress readings, the most recent being $471.0 million for Q1 2026.

  • On a quarterly basis, Construction in Progress fell 32.03% to $471.0 million in Q1 2026 year-over-year; TTM through Mar 2026 was $471.0 million, a 32.03% decrease, with the full-year FY2025 number at $416.0 million, down 26.63% from a year prior.
  • Construction in Progress hit $471.0 million in Q1 2026 for Portland General Electric, up from $416.0 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $974.0 million in Q4 2023 to a low of $349.0 million in Q1 2022.
  • Median Construction in Progress over the past 5 years was $567.0 million (2024), compared with a mean of $567.4 million.
  • Biggest five-year swings in Construction in Progress: soared 108.57% in 2023 and later tumbled 47.45% in 2025.
  • Portland General Electric's Construction in Progress stood at $467.0 million in 2022, then surged by 108.57% to $974.0 million in 2023, then tumbled by 41.79% to $567.0 million in 2024, then decreased by 26.63% to $416.0 million in 2025, then rose by 13.22% to $471.0 million in 2026.
  • The last three reported values for Construction in Progress were $471.0 million (Q1 2026), $416.0 million (Q4 2025), and $422.0 million (Q3 2025) per Business Quant data.