Portland General Electric (POR) Construction in Progress (2016 - 2025)

Portland General Electric's Construction in Progress history spans 10 years, with the latest figure at $416.0 million for Q4 2025.

  • For Q4 2025, Construction in Progress fell 26.63% year-over-year to $416.0 million; the TTM value through Dec 2025 reached $416.0 million, down 26.63%, while the annual FY2025 figure was $416.0 million, 26.63% down from the prior year.
  • Construction in Progress reached $416.0 million in Q4 2025 per POR's latest filing, down from $422.0 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $974.0 million in Q4 2023 to a low of $313.0 million in Q4 2021.
  • Average Construction in Progress over 5 years is $548.6 million, with a median of $506.5 million recorded in 2021.
  • Peak YoY movement for Construction in Progress: surged 108.57% in 2023, then plummeted 47.45% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $313.0 million in 2021, then skyrocketed by 49.2% to $467.0 million in 2022, then surged by 108.57% to $974.0 million in 2023, then tumbled by 41.79% to $567.0 million in 2024, then decreased by 26.63% to $416.0 million in 2025.
  • Per Business Quant, the three most recent readings for POR's Construction in Progress are $416.0 million (Q4 2025), $422.0 million (Q3 2025), and $718.0 million (Q2 2025).