Growth Metrics

Pure Cycle (PCYO) Construction in Progress (2021 - 2025)

Pure Cycle (PCYO) has disclosed Construction in Progress for 5 consecutive years, with $103000.0 as the latest value for Q3 2025.

  • On a quarterly basis, Construction in Progress fell 89.82% to $103000.0 in Q3 2025 year-over-year; TTM through Aug 2025 was $103000.0, a 89.82% decrease, with the full-year FY2025 number at $103000.0, down 89.82% from a year prior.
  • Construction in Progress was $103000.0 for Q3 2025 at Pure Cycle, down from $2.5 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $6.2 million in Q1 2024 to a low of $103000.0 in Q3 2025.
  • A 5-year average of $3.2 million and a median of $3.0 million in 2021 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: skyrocketed 345.83% in 2023, then tumbled 89.82% in 2025.
  • Pure Cycle's Construction in Progress stood at $3.0 million in 2021, then fell by 17.64% to $2.5 million in 2022, then soared by 136.11% to $5.9 million in 2023, then tumbled by 55.94% to $2.6 million in 2024, then tumbled by 96.01% to $103000.0 in 2025.
  • Per Business Quant, the three most recent readings for PCYO's Construction in Progress are $103000.0 (Q3 2025), $2.5 million (Q2 2025), and $1.9 million (Q1 2025).