Growth Metrics

Pure Cycle (PCYO) Construction in Progress (2021 - 2025)

Pure Cycle (PCYO) has disclosed Construction in Progress for 5 consecutive years, with $103000.0 as the latest value for Q3 2025.

  • Quarterly Construction in Progress fell 89.82% to $103000.0 in Q3 2025 from the year-ago period, while the trailing twelve-month figure was $103000.0 through Aug 2025, down 89.82% year-over-year, with the annual reading at $103000.0 for FY2025, 89.82% down from the prior year.
  • Construction in Progress for Q3 2025 was $103000.0 at Pure Cycle, down from $2.5 million in the prior quarter.
  • The five-year high for Construction in Progress was $6.2 million in Q1 2024, with the low at $103000.0 in Q3 2025.
  • Average Construction in Progress over 5 years is $3.2 million, with a median of $3.0 million recorded in 2021.
  • The sharpest move saw Construction in Progress surged 345.83% in 2023, then crashed 89.82% in 2025.
  • Over 5 years, Construction in Progress stood at $3.0 million in 2021, then dropped by 17.64% to $2.5 million in 2022, then skyrocketed by 136.11% to $5.9 million in 2023, then crashed by 55.94% to $2.6 million in 2024, then crashed by 96.01% to $103000.0 in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $103000.0, $2.5 million, and $1.9 million for Q3 2025, Q2 2025, and Q1 2025 respectively.