Oge Energy (OGE) Construction in Progress (2016 - 2025)
Oge Energy's Construction in Progress history spans 17 years, with the latest figure at $744.9 million for Q4 2025.
- On a quarterly basis, Construction in Progress fell 8.51% to $744.9 million in Q4 2025 year-over-year; TTM through Dec 2025 was $744.9 million, a 8.51% decrease, with the full-year FY2025 number at $744.9 million, down 8.51% from a year prior.
- Construction in Progress hit $744.9 million in Q4 2025 for Oge Energy, up from $708.8 million in the prior quarter.
- Over the last five years, Construction in Progress for OGE hit a ceiling of $887.0 million in Q1 2025 and a floor of $181.0 million in Q2 2021.
- Historically, Construction in Progress has averaged $498.9 million across 5 years, with a median of $486.8 million in 2023.
- Biggest five-year swings in Construction in Progress: soared 111.19% in 2023 and later fell 9.56% in 2025.
- Tracing OGE's Construction in Progress over 5 years: stood at $252.0 million in 2021, then skyrocketed by 73.06% to $436.1 million in 2022, then rose by 19.74% to $522.2 million in 2023, then soared by 55.92% to $814.2 million in 2024, then fell by 8.51% to $744.9 million in 2025.
- Business Quant data shows Construction in Progress for OGE at $744.9 million in Q4 2025, $708.8 million in Q3 2025, and $690.7 million in Q2 2025.