NorthWestern Energy (NWE) Construction in Progress (2022 - 2025)

Historic Construction in Progress for NorthWestern Energy (NWE) over the last 4 years, with Q4 2025 value amounting to $217.9 million.

  • NorthWestern Energy's Construction in Progress rose 3226.92% to $217.9 million in Q4 2025 from the same period last year, while for Dec 2025 it was $217.9 million, marking a year-over-year increase of 3226.92%. This contributed to the annual value of $217.9 million for FY2025, which is 3226.92% up from last year.
  • NorthWestern Energy's Construction in Progress amounted to $217.9 million in Q4 2025, which was up 3226.92% from $164.8 million recorded in Q4 2024.
  • In the past 5 years, NorthWestern Energy's Construction in Progress ranged from a high of $377.2 million in Q4 2023 and a low of $164.8 million during Q4 2024
  • Over the past 4 years, NorthWestern Energy's median Construction in Progress value was $264.8 million (recorded in 2022), while the average stood at $267.9 million.
  • As far as peak fluctuations go, NorthWestern Energy's Construction in Progress crashed by 5632.31% in 2024, and later surged by 3226.92% in 2025.
  • Quarter analysis of 4 years shows NorthWestern Energy's Construction in Progress stood at $311.7 million in 2022, then increased by 21.05% to $377.2 million in 2023, then crashed by 56.32% to $164.8 million in 2024, then skyrocketed by 32.27% to $217.9 million in 2025.
  • Its last three reported values are $217.9 million in Q4 2025, $164.8 million for Q4 2024, and $377.2 million during Q4 2023.