NorthWestern Energy (NWE) Construction in Progress (2022 - 2025)
NorthWestern Energy filings provide 4 years of Construction in Progress readings, the most recent being $217.9 million for Q4 2025.
- On a quarterly basis, Construction in Progress rose 32.27% to $217.9 million in Q4 2025 year-over-year; TTM through Dec 2025 was $217.9 million, a 32.27% increase, with the full-year FY2025 number at $217.9 million, up 32.27% from a year prior.
- Construction in Progress hit $217.9 million in Q4 2025 for NorthWestern Energy, up from $164.8 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $377.2 million in Q4 2023 to a low of $164.8 million in Q4 2024.
- Median Construction in Progress over the past 4 years was $264.8 million (2022), compared with a mean of $267.9 million.
- Biggest five-year swings in Construction in Progress: tumbled 56.32% in 2024 and later soared 32.27% in 2025.
- NorthWestern Energy's Construction in Progress stood at $311.7 million in 2022, then grew by 21.05% to $377.2 million in 2023, then tumbled by 56.32% to $164.8 million in 2024, then surged by 32.27% to $217.9 million in 2025.
- The last three reported values for Construction in Progress were $217.9 million (Q4 2025), $164.8 million (Q4 2024), and $377.2 million (Q4 2023) per Business Quant data.