NorthWestern Energy (NWE) Construction in Progress (2022 - 2025)

NorthWestern Energy's Construction in Progress history spans 4 years, with the latest figure at $217.9 million for Q4 2025.

  • For Q4 2025, Construction in Progress rose 32.27% year-over-year to $217.9 million; the TTM value through Dec 2025 reached $217.9 million, up 32.27%, while the annual FY2025 figure was $217.9 million, 32.27% up from the prior year.
  • Construction in Progress reached $217.9 million in Q4 2025 per NWE's latest filing, up from $164.8 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $377.2 million in Q4 2023 to a low of $164.8 million in Q4 2024.
  • Average Construction in Progress over 4 years is $267.9 million, with a median of $264.8 million recorded in 2022.
  • Peak YoY movement for Construction in Progress: plummeted 56.32% in 2024, then surged 32.27% in 2025.
  • A 4-year view of Construction in Progress shows it stood at $311.7 million in 2022, then grew by 21.05% to $377.2 million in 2023, then tumbled by 56.32% to $164.8 million in 2024, then surged by 32.27% to $217.9 million in 2025.
  • Per Business Quant, the three most recent readings for NWE's Construction in Progress are $217.9 million (Q4 2025), $164.8 million (Q4 2024), and $377.2 million (Q4 2023).