Alliant Energy (LNT) Construction in Progress (2016 - 2025)

Alliant Energy filings provide 14 years of Construction in Progress readings, the most recent being $1.7 billion for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 43.37% to $1.7 billion in Q4 2025 year-over-year; TTM through Dec 2025 was $1.7 billion, a 43.37% increase, with the full-year FY2025 number at $1.7 billion, up 43.37% from a year prior.
  • Construction in Progress hit $1.7 billion in Q4 2025 for Alliant Energy, up from $1.2 billion in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $1.7 billion in Q4 2025 to a low of $778.0 million in Q4 2021.
  • Median Construction in Progress over the past 5 years was $1.2 billion (2023), compared with a mean of $1.3 billion.
  • Biggest five-year swings in Construction in Progress: surged 92.1% in 2021 and later decreased 8.25% in 2023.
  • Alliant Energy's Construction in Progress stood at $778.0 million in 2021, then soared by 74.42% to $1.4 billion in 2022, then decreased by 8.25% to $1.2 billion in 2023, then fell by 2.41% to $1.2 billion in 2024, then soared by 43.37% to $1.7 billion in 2025.
  • The last three reported values for Construction in Progress were $1.7 billion (Q4 2025), $1.2 billion (Q4 2024), and $1.2 billion (Q4 2023) per Business Quant data.