Alliant Energy (LNT) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Alliant Energy (LNT) over the last 13 years, with Q4 2024 value amounting to $1.2 billion.
- Alliant Energy's Construction in Progress fell 240.96% to $1.2 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $1.2 billion, marking a year-over-year decrease of 240.96%. This contributed to the annual value of $1.2 billion for FY2024, which is 240.96% down from last year.
- Alliant Energy's Construction in Progress amounted to $1.2 billion in Q4 2024, which was down 240.96% from $1.2 billion recorded in Q4 2023.
- Over the past 5 years, Alliant Energy's Construction in Progress peaked at $1.4 billion during Q4 2022, and registered a low of $405.0 million during Q4 2020.
- Its 5-year average for Construction in Progress is $1.0 billion, with a median of $1.2 billion in 2024.
- As far as peak fluctuations go, Alliant Energy's Construction in Progress plummeted by 7792.92% in 2020, and later soared by 9209.88% in 2021.
- Over the past 5 years, Alliant Energy's Construction in Progress (Quarter) stood at $405.0 million in 2020, then surged by 92.1% to $778.0 million in 2021, then skyrocketed by 74.42% to $1.4 billion in 2022, then fell by 8.25% to $1.2 billion in 2023, then fell by 2.41% to $1.2 billion in 2024.
- Its Construction in Progress was $1.2 billion in Q4 2024, compared to $1.2 billion in Q4 2023 and $1.4 billion in Q4 2022.