Growth Metrics

Sanfilippo John B & Son (JBSS) Construction in Progress (2018 - 2025)

Sanfilippo John B & Son's Construction in Progress history spans 13 years, with the latest figure at $19.0 million for Q4 2025.

  • For Q4 2025, Construction in Progress fell 1.72% year-over-year to $19.0 million; the TTM value through Dec 2025 reached $19.0 million, down 1.72%, while the annual FY2025 figure was $7.2 million, 4.57% down from the prior year.
  • Construction in Progress reached $19.0 million in Q4 2025 per JBSS's latest filing, up from $12.7 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $19.4 million in Q4 2024 to a low of $4.0 million in Q4 2023.
  • Average Construction in Progress over 5 years is $11.5 million, with a median of $9.8 million recorded in 2021.
  • Peak YoY movement for Construction in Progress: surged 448.17% in 2021, then plummeted 59.91% in 2023.
  • A 5-year view of Construction in Progress shows it stood at $17.3 million in 2021, then tumbled by 42.76% to $9.9 million in 2022, then tumbled by 59.91% to $4.0 million in 2023, then surged by 389.04% to $19.4 million in 2024, then decreased by 1.72% to $19.0 million in 2025.
  • Per Business Quant, the three most recent readings for JBSS's Construction in Progress are $19.0 million (Q4 2025), $12.7 million (Q3 2025), and $7.2 million (Q2 2025).