Idacorp (IDA) Construction in Progress (2016 - 2025)

Idacorp (IDA) has disclosed Construction in Progress for 17 consecutive years, with $1.6 billion as the latest value for Q3 2025.

  • On a quarterly basis, Construction in Progress rose 24.4% to $1.6 billion in Q3 2025 year-over-year; TTM through Sep 2025 was $1.6 billion, a 24.4% increase, with the full-year FY2024 number at $1.2 billion, up 26.29% from a year prior.
  • Construction in Progress was $1.6 billion for Q3 2025 at Idacorp, up from $1.4 billion in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $1.6 billion in Q3 2025 to a low of $600.8 million in Q2 2021.
  • A 5-year average of $982.0 million and a median of $955.3 million in 2023 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: increased 4.39% in 2021, then surged 39.75% in 2023.
  • Idacorp's Construction in Progress stood at $670.6 million in 2021, then rose by 17.17% to $785.7 million in 2022, then increased by 25.43% to $985.5 million in 2023, then rose by 26.29% to $1.2 billion in 2024, then soared by 30.16% to $1.6 billion in 2025.
  • Per Business Quant, the three most recent readings for IDA's Construction in Progress are $1.6 billion (Q3 2025), $1.4 billion (Q2 2025), and $1.4 billion (Q1 2025).