Idacorp (IDA) Construction in Progress (2016 - 2026)
Idacorp has reported Construction in Progress over the past 18 years, most recently at $1.9 billion for Q1 2026.
- Quarterly Construction in Progress rose 40.42% to $1.9 billion in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $1.9 billion through Mar 2026, up 40.42% year-over-year, with the annual reading at $1.7 billion for FY2025, 39.87% up from the prior year.
- Construction in Progress was $1.9 billion for Q1 2026 at Idacorp, up from $1.7 billion in the prior quarter.
- Over five years, Construction in Progress peaked at $1.9 billion in Q1 2026 and troughed at $708.5 million in Q2 2022.
- The 5-year median for Construction in Progress is $1.1 billion (2024), against an average of $1.2 billion.
- Year-over-year, Construction in Progress increased 14.71% in 2025 and then skyrocketed 40.42% in 2026.
- A 5-year view of Construction in Progress shows it stood at $785.7 million in 2022, then grew by 25.43% to $985.5 million in 2023, then increased by 26.29% to $1.2 billion in 2024, then soared by 39.87% to $1.7 billion in 2025, then grew by 11.72% to $1.9 billion in 2026.
- Per Business Quant, the three most recent readings for IDA's Construction in Progress are $1.9 billion (Q1 2026), $1.7 billion (Q4 2025), and $1.6 billion (Q3 2025).