Cash Flow Statement

Hydro One (HRNNF) Construction in Progress (2017 - 2025)

Hydro One (HRNNF) has disclosed Construction in Progress for 6 consecutive years, with $1.5 billion as the latest value for Q4 2024.

  • On a quarterly basis, Construction in Progress rose 36.83% to $1.5 billion in Q4 2024 year-over-year; TTM through Dec 2024 was $1.5 billion, a 36.83% increase, with the full-year FY2024 number at $1.5 billion, up 38.36% from a year prior.
  • Construction in Progress was $1.5 billion for Q4 2024 at Hydro One, up from $1.1 billion in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $1.5 billion in Q4 2024 to a low of $870.6 million in Q4 2020.
  • A 3-year average of $1.2 billion and a median of $1.1 billion in 2023 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: rose 28.85% in 2020, then skyrocketed 36.83% in 2024.
  • Hydro One's Construction in Progress stood at $870.6 million in 2020, then rose by 26.98% to $1.1 billion in 2023, then surged by 36.83% to $1.5 billion in 2024.
  • Per Business Quant, the three most recent readings for HRNNF's Construction in Progress are $1.5 billion (Q4 2024), $1.1 billion (Q4 2023), and $870.6 million (Q4 2020).