Hydro One (HRNNF) Construction in Progress (2017 - 2025)
Hydro One (HRNNF) has disclosed Construction in Progress for 9 consecutive years, with $1.9 billion as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 23.17% to $1.9 billion in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $1.9 billion through Dec 2025, up 23.17% year-over-year, with the annual reading at $1.9 billion for FY2025, 23.17% up from the prior year.
- Construction in Progress for Q4 2025 was $1.9 billion at Hydro One, up from $1.5 billion in the prior quarter.
- The five-year high for Construction in Progress was $1.9 billion in Q4 2025, with the low at $906.1 million in Q4 2022.
- Average Construction in Progress over 5 years is $1.3 billion, with a median of $1.1 billion recorded in 2021.
- The sharpest move saw Construction in Progress decreased 19.39% in 2022, then surged 36.83% in 2024.
- Over 5 years, Construction in Progress stood at $1.1 billion in 2021, then decreased by 19.39% to $906.1 million in 2022, then rose by 22.0% to $1.1 billion in 2023, then skyrocketed by 36.83% to $1.5 billion in 2024, then increased by 23.17% to $1.9 billion in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $1.9 billion, $1.5 billion, and $1.1 billion for Q4 2025, Q4 2024, and Q4 2023 respectively.