Hydro One (HRNNF) Construction in Progress (2017 - 2025)

Hydro One has reported Construction in Progress over the past 9 years, most recently at $1.9 billion for Q4 2025.

  • For Q4 2025, Construction in Progress rose 23.17% year-over-year to $1.9 billion; the TTM value through Dec 2025 reached $1.9 billion, up 23.17%, while the annual FY2025 figure was $1.9 billion, 23.17% up from the prior year.
  • Construction in Progress was $1.9 billion for Q4 2025 at Hydro One, up from $1.5 billion in the prior quarter.
  • Across five years, Construction in Progress topped out at $1.9 billion in Q4 2025 and bottomed at $906.1 million in Q4 2022.
  • The 5-year median for Construction in Progress is $1.1 billion (2021), against an average of $1.3 billion.
  • Year-over-year, Construction in Progress fell 19.39% in 2022 and then surged 36.83% in 2024.
  • Over 5 years, Construction in Progress stood at $1.1 billion in 2021, then fell by 19.39% to $906.1 million in 2022, then rose by 22.0% to $1.1 billion in 2023, then surged by 36.83% to $1.5 billion in 2024, then grew by 23.17% to $1.9 billion in 2025.
  • The last three reported values for Construction in Progress were $1.9 billion (Q4 2025), $1.5 billion (Q4 2024), and $1.1 billion (Q4 2023) per Business Quant data.