Hawaiian Electric Industries (HE) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Hawaiian Electric Industries (HE) over the last 17 years, with Q3 2025 value amounting to $409.7 million.
- Hawaiian Electric Industries' Construction in Progress rose 1819.06% to $409.7 million in Q3 2025 from the same period last year, while for Sep 2025 it was $409.7 million, marking a year-over-year increase of 1819.06%. This contributed to the annual value of $365.7 million for FY2024, which is 1420.38% up from last year.
- Latest data reveals that Hawaiian Electric Industries reported Construction in Progress of $409.7 million as of Q3 2025, which was up 1819.06% from $396.3 million recorded in Q2 2025.
- Hawaiian Electric Industries' Construction in Progress' 5-year high stood at $409.7 million during Q3 2025, with a 5-year trough of $201.8 million in Q2 2021.
- In the last 5 years, Hawaiian Electric Industries' Construction in Progress had a median value of $320.2 million in 2023 and averaged $302.2 million.
- As far as peak fluctuations go, Hawaiian Electric Industries' Construction in Progress crashed by 591.41% in 2021, and later soared by 4913.25% in 2023.
- Over the past 5 years, Hawaiian Electric Industries' Construction in Progress (Quarter) stood at $231.5 million in 2021, then increased by 26.59% to $293.0 million in 2022, then grew by 9.27% to $320.2 million in 2023, then rose by 14.2% to $365.7 million in 2024, then rose by 12.04% to $409.7 million in 2025.
- Its last three reported values are $409.7 million in Q3 2025, $396.3 million for Q2 2025, and $376.2 million during Q1 2025.