Global Water Resources (GWRS) Construction in Progress (2020 - 2024)
Historic Construction in Progress for Global Water Resources (GWRS) over the last 5 years, with Q3 2024 value amounting to $66.7 million.
- Global Water Resources' Construction in Progress rose 4470.77% to $66.7 million in Q3 2024 from the same period last year, while for Sep 2024 it was $66.7 million, marking a year-over-year increase of 4470.77%. This contributed to the annual value of $48.1 million for FY2023, which is 2709.31% down from last year.
- According to the latest figures from Q3 2024, Global Water Resources' Construction in Progress is $66.7 million, which was up 4470.77% from $59.1 million recorded in Q2 2024.
- Over the past 5 years, Global Water Resources' Construction in Progress peaked at $70.7 million during Q1 2023, and registered a low of $40.9 million during Q4 2020.
- Over the past 5 years, Global Water Resources' median Construction in Progress value was $59.1 million (recorded in 2024), while the average stood at $59.1 million.
- In the last 5 years, Global Water Resources' Construction in Progress plummeted by 3349.16% in 2023 and then surged by 4470.77% in 2024.
- Global Water Resources' Construction in Progress (Quarter) stood at $40.9 million in 2020, then surged by 30.91% to $53.5 million in 2021, then grew by 23.41% to $66.0 million in 2022, then fell by 27.09% to $48.1 million in 2023, then soared by 38.54% to $66.7 million in 2024.
- Its last three reported values are $66.7 million in Q3 2024, $59.1 million for Q2 2024, and $51.8 million during Q1 2024.