Firstenergy (FE) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Firstenergy (FE) over the last 17 years, with Q3 2025 value amounting to $3.7 billion.
- Firstenergy's Construction in Progress rose 3691.91% to $3.7 billion in Q3 2025 from the same period last year, while for Sep 2025 it was $3.7 billion, marking a year-over-year increase of 3691.91%. This contributed to the annual value of $2.8 billion for FY2024, which is 3015.12% up from last year.
- Latest data reveals that Firstenergy reported Construction in Progress of $3.7 billion as of Q3 2025, which was up 3691.91% from $3.3 billion recorded in Q2 2025.
- In the past 5 years, Firstenergy's Construction in Progress ranged from a high of $3.7 billion in Q3 2025 and a low of $1.4 billion during Q4 2021
- In the last 5 years, Firstenergy's Construction in Progress had a median value of $1.9 billion in 2023 and averaged $2.1 billion.
- Its Construction in Progress has fluctuated over the past 5 years, first crashed by 1039.29% in 2021, then skyrocketed by 4630.28% in 2025.
- Firstenergy's Construction in Progress (Quarter) stood at $1.4 billion in 2021, then rose by 19.73% to $1.7 billion in 2022, then grew by 24.99% to $2.1 billion in 2023, then soared by 30.15% to $2.8 billion in 2024, then skyrocketed by 35.88% to $3.7 billion in 2025.
- Its Construction in Progress stands at $3.7 billion for Q3 2025, versus $3.3 billion for Q2 2025 and $2.9 billion for Q1 2025.