Growth Metrics

Firstenergy (FE) Construction in Progress (2016 - 2025)

Firstenergy (FE) has disclosed Construction in Progress for 15 consecutive years, with $3.4 billion as the latest value for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 23.06% to $3.4 billion in Q4 2025 year-over-year; TTM through Dec 2025 was $3.4 billion, a 23.06% increase, with the full-year FY2025 number at $3.4 billion, up 23.06% from a year prior.
  • Construction in Progress was $3.4 billion for Q4 2025 at Firstenergy, down from $3.7 billion in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $3.7 billion in Q3 2025 to a low of $1.4 billion in Q4 2021.
  • A 5-year average of $2.2 billion and a median of $2.0 billion in 2023 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: decreased 10.39% in 2021, then soared 46.3% in 2025.
  • Firstenergy's Construction in Progress stood at $1.4 billion in 2021, then increased by 19.73% to $1.7 billion in 2022, then grew by 24.99% to $2.1 billion in 2023, then skyrocketed by 30.15% to $2.8 billion in 2024, then increased by 23.06% to $3.4 billion in 2025.
  • Per Business Quant, the three most recent readings for FE's Construction in Progress are $3.4 billion (Q4 2025), $3.7 billion (Q3 2025), and $3.3 billion (Q2 2025).