Firstenergy (FE) Construction in Progress (2016 - 2025)
Firstenergy (FE) has disclosed Construction in Progress for 15 consecutive years, with $3.4 billion as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 23.06% to $3.4 billion in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $3.4 billion through Dec 2025, up 23.06% year-over-year, with the annual reading at $3.4 billion for FY2025, 23.06% up from the prior year.
- Construction in Progress for Q4 2025 was $3.4 billion at Firstenergy, down from $3.7 billion in the prior quarter.
- The five-year high for Construction in Progress was $3.7 billion in Q3 2025, with the low at $1.4 billion in Q4 2021.
- Average Construction in Progress over 5 years is $2.2 billion, with a median of $2.0 billion recorded in 2023.
- The sharpest move saw Construction in Progress fell 10.39% in 2021, then skyrocketed 46.3% in 2025.
- Over 5 years, Construction in Progress stood at $1.4 billion in 2021, then rose by 19.73% to $1.7 billion in 2022, then increased by 24.99% to $2.1 billion in 2023, then surged by 30.15% to $2.8 billion in 2024, then rose by 23.06% to $3.4 billion in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $3.4 billion, $3.7 billion, and $3.3 billion for Q4 2025, Q3 2025, and Q2 2025 respectively.