Growth Metrics

Firstenergy (FE) Construction in Progress (2016 - 2026)

Firstenergy has reported Construction in Progress over the past 16 years, most recently at $3.9 billion for Q1 2026.

  • Quarterly Construction in Progress rose 33.39% to $3.9 billion in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $3.9 billion through Mar 2026, up 33.39% year-over-year, with the annual reading at $3.4 billion for FY2025, 23.06% up from the prior year.
  • Construction in Progress was $3.9 billion for Q1 2026 at Firstenergy, up from $3.4 billion in the prior quarter.
  • Over five years, Construction in Progress peaked at $3.9 billion in Q1 2026 and troughed at $1.5 billion in Q1 2022.
  • The 5-year median for Construction in Progress is $2.2 billion (2023), against an average of $2.5 billion.
  • Year-over-year, Construction in Progress fell 9.7% in 2022 and then soared 46.3% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $1.7 billion in 2022, then rose by 24.99% to $2.1 billion in 2023, then soared by 30.15% to $2.8 billion in 2024, then grew by 23.06% to $3.4 billion in 2025, then rose by 15.4% to $3.9 billion in 2026.
  • Per Business Quant, the three most recent readings for FE's Construction in Progress are $3.9 billion (Q1 2026), $3.4 billion (Q4 2025), and $3.7 billion (Q3 2025).